Similar Projects
Improvements to the Water Feature Circulation System at Sonnenberg Gardens and Mansion State Historic Park
Infrastructure
Bidding
$211,400 to $286,000 est. value
Canandaigua, NY 14424

Drilling of Wells and Test Borings
Term Contract
Bidding
Great River, NY

Sanitary Sewer Improvements/Replacement of Grinder Pumps
Post-Bid
Sand Lake, NY 12153

Screw Pump Replacement at Middletown WWTF
Post-Bid
Less than $600,000 est. value
Middletown, NY 10940

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

Uniondale Wells 5 & 6 Treatment Improvements
Infrastructure
Bidding
Uniondale, NY

Raw Wastewater Pump and Motor 1 and 5 Rehabilitation
Post-Bid
Buffalo, NY 14213

Furnish and Deliver Decant Pumps and Mixers for Erie County Water Authority
Results
Cheektowaga, NY 14227

The Uniondale Water District - General Construction
Alteration
Bidding
East Meadow, NY 11554

Worthington Pump Rebuild at Water Pollution Control Facility
Post-Bid
Williamsville, NY 14221

Replacement of Duplex Sump Pumps at School 23
Results
Yonkers, NY 10701

1,4-Dioxane, PFOA and PFOS Treatment at Wells 1A and 2R
Infrastructure
Bidding
Carle Place, NY

Pottersville Well #2 Improvements Project
Post-Bid
Pottersville, NY 12817

Sump Pumps
Results
White Plains, NY 10601

Last Updated 02/01/2022 09:05 AM
Project Title

Hurleyville Well 2R Improvements Project

Physical Address View project details and contacts
City, State (County) South Fallsburg, NY   (Sullivan County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following: 1. Furnish and install one submersible well pump including all interconnecting piping, power and controls, wiring, programming and any necessary appurtenances required for complete installation. 2. Furnish and install approximately 25 linear feet of buried 6-inch ductile iron pipe connecting the new production Well 2R to the existing Hurleyville Well House No. 2. 3. Furnish and install all ductile iron process piping, valves, instruments, and appurtenances necessary to connect the new groundwater well to the existing system within Hurleyville Well House No. 2.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 09 - Finishes.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 40 - Process Integration.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents