Similar Projects
Artificial Snow Surface for Summer Tubing Project
Infrastructure
Bidding
Sioux City, IA 51106

Debris Removal
Infrastructure
Post-Bid
Hamburg, IA

Snow Removal - Sidewalk Services and Bridges
Term Contract
Post-Bid
Lincoln, IA

Asbury Sludge Removal 2021
Term Contract
Results
$95,000 est. value
Asbury, IA

Purchase and Hauling of Top Soil
Term Contract
Results
Davenport, IA

Snow and Ice Removal - River Front Improvement Commission (Freight House and Union Station), Libraries, and Bus Shelters
Infrastructure
Post-Bid
Davenport, IA

Indian Creek Waterway Cleanup
Infrastructure
Results
Cedar Rapids, IA

Snow Removal - Downtown/Harrison Hilltop ADA Ramp and Bridge Deck
Infrastructure
Post-Bid
Davenport, IA

Snow Removal and Hauling Services
Term Contract
Post-Bid
Waterloo, IA 50703

Snow Hauling
Term Contract
Post-Bid
Davenport, IA

Snow and Melting Services
Term Contract
Post-Bid
Riverdale, IA

Snow/Ice Removal Designated on Street Angle Parking
Term Contract
Post-Bid
Coralville, IA

Snow Removal
Infrastructure
Post-Bid
Grimes, IA

Nuisance and City-Owned Parcels Snow and Ice Removal 2021-2022
Term Contract
Post-Bid
Davenport, IA

Snow Removal
Term Contract
Post-Bid
Mc Callsburg, McCallsburg, IA 50154

Reported 02/09/2022 12:00 AM
Project Title

Debris Removal and Dumpster

Physical Address View project details and contacts
City, State (County) Harpers Ferry, IA   (Allamakee County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide dumpsters to aid in the disposal of demolition debris from multiple structures and debris piles within approximately 20 mile radius of the address listed above. The dumpsters will be provided for two different types of material, to be separated by refuge staff. The two types of material are; concrete (metal reinforcement not removed ie, clean concrete) and general demolition debris. The structures have been tested and abated for any known hazardous materials. If a source can be found to recycle the concrete dumpsters may not be needed.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents