Similar Projects
Last Updated | 12/17/2023 10:05 PM |
Project Title | Sprinkler Repair at 50 Murray Ave |
Physical Address | View project details and contacts |
City, State (County) | Worcester, MA 01610 (Worcester County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $14,700 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish labor and material to replace leaking 6" Backflow Preventer (Double Check Valve Assembly) on the incoming fire service main at Murray Apts. 1. Replace the leaking section of sprinkler main in the basement which will require, but not limited to: Four feet of new 6" Schedule 10 Sprinkler Pipe, Two (2) new Grooved Couplings, Permit 2. Replace the leaking 6" Backflow Preventer (Double Check Valve Assembly) on the incoming fire service main which will require, but not limited to: One (1) new Ames Double Check Valve Assembly, All necessary pipes, fittings, and hardware necessary for complete installation, Permit. All questions or requests for clarification must be submitted in writing by email to purchasing@worcesterha.org. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |