Similar Projects
Transformers and Vacuum Switches
Term Contract
Bidding
TX

Distribution Line Clearance, Street and Nightwatchman Lights
Term Contract
Post-Bid
Austin, TX 78767

Electrical Wires, Cables
Post-Bid
Houston, TX 77251

Campus Switch Upgrades - Phase 2 (Austin ISD E-Rate Project)
Results
Less than $4,000,000 est. value
Austin, TX 73301

Electrical Maintenance
Results
Plano, TX 75023

Electrical Work Needed at our Community Center
Post-Bid
Paint Rock, TX 76866

Back-Up Generator Preventative Maintenance and Repair
Term Contract
Results
Argyle, Copper Canyon, Flower Mound, Hickory Creek, Lake Dallas, Lewisville, Little Elm, TX 75057

Generator and Control Panel
Post-Bid
Houston, TX

General Electrical Services
Term Contract
Results
$50,000 est. value
Lewisville, TX 75057

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Lightning Protection System
Results
Less than $14,780 est. value
Austin, TX 78767

Uninterruptible Power Supply (UPS)
Post-Bid
Dallas, TX 75214

West Irving Aquatic Center Security Light Improvements
Results
Irving, TX 75061

Electrical Maintenance and Repair - Waco
Post-Bid
Belton, Gatesville, Hamilton, Hillsboro, Marlin, Mexia, Temple, Waco, TX 76513

Y1DA--Project No. 580-21-102 Install Electrical for Patient Lift System and Omnicells
Results
$100,000 to $250,000 est. value
Houston, TX

Last Updated 09/14/2021 10:35 AM
Project Title

Lake Granbury Power Line Clearance Project

Physical Address View project details and contacts
City, State (County) Granbury, TX   (Hood County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project scope includes (but is not limited to) the retirement of six (6) existing wooden poles, and the installation of two (2) new wooden poles, and two (2) engineered concrete poles. The work will require the retirement of multiple conductor spans associated with the retired poles; the installation of three (3) open wire conductor spans, and one 1200’(+) span of Hendrix spacer cable over Lake Granbury.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents