Similar Projects
Clearing and Grubbing, Removal of Bridge, Grading, Drainage Structures
New Construction, Infrastructure
Bidding
$50,000,000 to $70,000,000 est. value

Clearing and Grubbing, Removal of Bridge, Grading, Drainage Structures
New Construction, Infrastructure
Bidding
$50,000,000 to $70,000,000 est. value

Herman Dupuis Road Pontoon Bridge Replacement
New Construction
Post-Bid
Saint Martinville, LA

Caplis Sligo Road Bridge over Red Chute Bayou
New Construction
Post-Bid
Benton, LA

LA 10 - Palmetto Company Canal Br
New Construction
Results
$2,500,000 to $5,000,000 est. value
Ville Platte, LA 70586

Breithaupt Cutoff Road Bridge Over Rhinehart Creek
New Construction
Results
$250,000 to $500,000 est. value
Jena, LA 71342

Morrison Road Bridges
Renovation, Infrastructure
Bidding
New Orleans, LA

Construction of CenturyLink Drive Bridge Over Bayou Desiard
New Construction
Post-Bid
Monroe, LA

LA 378 - Calcasieu Rvr West Fork Mb Re(HBI)
New Construction
Results
$250,000 to $500,000 est. value
Westlake, LA 70669

LA 160 - Dorcheat Bayou Bridge
Renovation, Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
LA

Pate Lane Bridge over Selsers Creek [W3 Main]
New Construction
Post-Bid
Less than $860,000 est. value
Amite, LA

LA 835: Boeuf River Bridge Near Concord
New Construction
Results
$2,500,000 to $5,000,000 est. value

Tammany Trace Bridge No.16
New Construction, Infrastructure
Bidding
$1,105,100 est. value
Mandeville, LA 70471

Replacement of Standard Oil Road Bridge
Renovation
Post-Bid
Shreveport, LA

LA 86 Daspit Br Hydr Cyl Rehab (HBI)
New Construction
Results
$250,000 to $500,000 est. value
New Iberia, LA 70560

Last Updated 03/25/2022 12:59 PM
Project Title

Third Avenue Bridge Replacement at Ponchitolawa Creek

Physical Address View project details and contacts
City, State (County) Covington, LA   (Saint Tammany County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,657,588
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Location of Work: The work is located at Third Avenue bridge (B03L007) Section 23, Township 7, South Range 11 E, Covington, Louisiana.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents