Similar Projects
Stapley Road Utility Line: University to McKellips - CP0219 - City of Mesa
Infrastructure
Conception
$2,149,906 est. value
Mesa, AZ 85204

Echo Ramp East Overlay - CP0927 - City of Mesa
Infrastructure
Conception
$5,227,296 est. value
Mesa, AZ 85215

Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Broadstone At The Grand Phase II
New Construction, Infrastructure
Design
$109,000,000 est. value
Tempe, AZ 85281

Ballfield Grading
Infrastructure
Bidding
$65,000 est. value
Scottsdale, AZ

Mack Supplier Infrastructure Project
Infrastructure
Post-Bid
Phoenix, AZ 85085

South Anchor Development
Infrastructure
Post-Bid
Gilbert, AZ 85234

Gas Line Installation at Taylor Junior High
Results
Mesa, AZ 85204

Purchase and Development of City-Owned Land - Danelle Plaza
Results
Tempe, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

One Scottsdale Campus Site Improvements - Phase 1
New Construction
Construction
Scottsdale, AZ 85255

Dog Park - Countryside Park - CP0933 - City of Mesa
New Construction, Alteration
Conception
$1,054,704 est. value
Mesa, AZ

Papago Plaza - Sprouts
New Construction, Infrastructure - 23,453 SF
Design
$4,000,000 est. value
Scottsdale, AZ 85257

J065--Medical Gas System Repair Services for The Phoenix VA Health Care System (PVAHCS)
Term Contract
Post-Bid
Phoenix, AZ 85012

Citywide Civil Site Work
Infrastructure
Results
Peoria, AZ 85345

Last Updated 06/23/2022 07:35 AM
Project Title

Superstition Fuel Tank Replacement and Drainage Improvements - CP1005 - City of Mesa

Physical Address View project details and contacts
City, State (County) Mesa, AZ   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $3,007,019
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a civil project in Mesa, Arizona. Conceptual plans call for site work for a water / sewer project. Replace Fuel tank at Superstition Substation and improve drainage in parking lot. This project is included in the City of Mesa's 2023-2027 Capital Improvement Plan (CIP). As of June 22, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents