Similar Projects
Z--Replace Water Control Structures 64 and 65
Design
Brigham City, UT 84302

Willow Creek BDAS
Infrastructure
Bidding
Vernal, UT

UDOT Drainage Repair US 89 MP 340.10 on the Left Side of the Road
Infrastructure
Bidding
Orem, UT 84097

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

500 East 600 South Design
Post-Bid
Salem, UT 84653

Earthwork Removal and Replacement on a Side Slope at the Mexican Hat Disposal Site, Near Mexican Hat, Utah
Results
$500,000 to $1,000,000 est. value
Mexican Hat, UT

40th Street Detention Pond Project
Results
Less than $556,396 est. value
South Ogden, UT

DFCM Construction - Pre Qualified General - UDOT Tooele County Maintenance Stations
Infrastructure
Bidding
$312,000 est. value
Grantsville, Tooele, Wendover, UT 84029

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Construction of the 400 East Storm Drain Rehab Phase 1
Post-Bid
Saint George, UT 84770

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Remove and Replace Approximately 110` of 14" Irrigation Culvert or Pipe
Post-Bid
Hinckley, UT 84635

Jenkins Flat Pond for Juab County
Results
Less than $50,000 est. value
Nephi, UT 84648

Replacement of the Existing Water Diversion Structure of the Bench Canal Heading
Post-Bid
Duchesne, UT

Last Updated 08/10/2021 08:01 AM
Project Title

NUCK Woodward Creek Watershed Restoration BDA

Physical Address View project details and contacts
City, State (County) Huntington, UT   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chainsaw/labor crew of 4-6 people. Work alongside UDWR staff for stream stabilization project. Located 20 miles northwest of Huntington, Utah in Emery County. The project is located on Nuck Woodward Creek, a tributary to the Right Fork of Huntington Creek, in Emery County, Utah. We are seeking a small (4-6 person) chainsaw/labor crew to work alongside UDWR staff during a stream stabilization project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents