Similar Projects
(CBE) Lab Renovation
Renovation - 24,000 SF
Design
Madison, WI 53715

UWHC A7/B6-2 Infection Disease & Pulmonary Services Lab
Renovation
Post-Bid
Madison, WI 53792

Kenosha Campus Refrigeration Lab Remodel
Renovation
Post-Bid
Kenosha, WI 53144

DIV 3-Technology Lab Renovations - Washington Complex
Renovation
Results
Milwaukee, WI 53210

Fish Control Lab Building Rehabilitation-Phase 1
Renovation
Results
$695,000 est. value
La Crosse, WI

MilliporeSigma
Renovation
Construction
Madison, WI 53711

Renovation of Laboratory Space
Renovation
Post-Bid
La Crosse, WI 54603

Goodman South Campus Simulation Lab Remodel
Renovation - 2,500 SF
Results
Madison, WI 53713

MQC Anatomy and Physiology Classroom/Lab A226
Renovation
Post-Bid
Mequon, WI 53092

Wood Hall Financial Lab Renovation - GPC
Renovation
Results
$302,000 est. value
Green Bay, WI 54311

MATC Fort Atkinson Metal Fab Lab
Renovation, Addition, Infrastructure - 8,098 SF
Post-Bid
$1,350,000 est. value
Fort Atkinson, WI 53538

Wood Hall Financial Lab Renovation- MEP
Renovation
Results
Green Bay, WI

Noland Hall 3rd Floor Integrative Biology Lab Renovation - GPC
Renovation
Post-Bid
$477,000 est. value
Madison, WI 53715

Chemistry Building and Central Utilities Expansion - MEP
New Construction, Addition
Results
$84,000,000 est. value
Milwaukee, WI 53211

Noland Hall 3rd Floor Integrative Biology Lab Renovation - MEP
Renovation
Post-Bid
$477,000 est. value
Madison, WI 53715

Last Updated 04/19/2022 08:15 AM
Project Title

Historic U.S. Fish Control Lab Building Rehabilitation - Phase 2

Physical Address View project details and contacts
City, State (County) La Crosse, WI   (La Crosse County)
Category(s) Laboratory
Sub-Category(s) Laboratory
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work at the Historic U.S. Fish Control Lab Building consists of the restoration of the clay tile roof, replacement of the existing membrane (flat) roofs, and re-plumbing drain lines. All work shown in the drawings and specifications is required unless noted otherwise. This is the second in a multi-phase project. Work for Phase I is scheduled to be complete in spring of 2022. Phase III may commence prior to completing Phase II.

Details

Laboratory, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents