Similar Projects
Homes of Hope Townhomes - Charleston
New Construction - 109,500 SF
Conception
Charleston, SC

New Affordable Town House Development
New Construction - 1,100 SF
Conception
Charleston, SC 29422

Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

Grace Episcopal Church Parish Hall
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Charleston, SC 29401

Interstate Preservation - I-526
Infrastructure
Bidding
$600,000 CJ est. value
Mount Pleasant, SC 29464

Renovation of Infields at Jimmy Seignious Fields 1-3
Infrastructure
Bidding
$338,000 CJ est. value
Mount Pleasant, SC 29464

Construction Of Two Single-Family Homes
New Construction
Post-Bid
North Charleston, SC 29405

FLETC Training Venue Replication
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
North Charleston, SC 29405

Construction of Azalea Fuel Facility
New Construction, Infrastructure
Results
$13,906,000 CJ est. value
North Charleston, SC 29405

Construct Three (3) Single Family, Two Story, Detached Houses
New Construction - 6,484 SF
Results
Charleston, SC 29403

The Merchant
New Construction - 924,388 SF
Construction
$10,000,000 CJ est. value
Charleston, SC 29403

Spinx #368 / Charleston
New Construction, Infrastructure - 4,000 SF
Construction
$3,000,000 CJ est. value
Charleston, SC 29401

Christian Brothers - Charleston
New Construction, Infrastructure - 5,500 SF
Pending Verification
$1,250,000 CJ est. value
Charleston, SC 29412

O'Quinn School Addition
Addition, Demolition, Infrastructure - 21,000 SF
Pending Verification
$4,500,000 CJ est. value
Charleston, SC 29412

Morrison Yard Residences
New Construction
Conception
Charleston, SC 29403

Last Updated 10/06/2022 04:13 PM
Project Title

Fenwick Hall Allee Residential Development

Physical Address View project details and contacts
City, State (County) Kiawah Island, SC 29455   (Charleston County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $24,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a new subdivision with 75 lots. As of October 6, 2022, the project is seeking approval from the Charleston Technical Review Committee Review. An architect and general contractor have not yet been selected and the method of contractor selection has not been determined. Construction itimeline is unknown but not expected before 3rd quarter 2023. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents