Similar Projects
Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Conception
$150,000,000 CJ est. value
Goodyear, AZ 85338

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$5,550,000 CJ est. value
Buckeye, AZ 85326

Jomax Water Reclamation Facility Expansion - UT00388 - City of Peoria
Addition, Infrastructure
Conception
$65,499,546 CJ est. value
Peoria, AZ 85383

Fire Station 223 - C10124 - City of Mesa
New Construction, Infrastructure
Conception
$20,996,061 CJ est. value
Mesa, AZ 85201

Dog Park - Countryside Park - CP0933 - City of Mesa
New Construction, Alteration
Conception
$1,054,704 est. value
Mesa, AZ

Queen Creek Gate Station and High Pressure Gas Line Extension - CP0520GATE - City of Mesa
New Construction, Infrastructure
Conception
$5,051,724 CJ est. value
Mesa, AZ 85201

Mission Park Improvements - CIPPK22016 - City of Glendale
Renovation, Infrastructure
Conception
$653,093 est. value
Glendale, AZ 85302

Sarival Avenue / Bethany Home Road - Cipst23047 - City Of Glendale
Alteration
Conception
$923,565 est. value
Glendale, AZ 85301

New River Trail Improvements - CIPPK22036 - City of Glendale
Infrastructure
Conception
$420,998 est. value
Glendale, AZ 85305

8th Street Multi-Use Path (Creamery Branch Rail Path) - 6007139 - City of Tempe
Infrastructure
Conception
$2,034,624 CJ est. value
Tempe, AZ 85281

Share-Use Path: Consolidated to Eastern Canal Connection - CP0872 - City of Mesa
Infrastructure
Conception
$3,750,470 est. value
Mesa, AZ 85209

Babbitt Ranch Solar and Storage
New Construction, Infrastructure
Conception
$98,000,000 CJ est. value
Williams, AZ 86046

Babbitt Ranch Wind
New Construction, Infrastructure
Conception
$39,500,000 CJ est. value
Williams, AZ 86046

Indian Springs Road From 143rd Avenue to Gila River Bridge - T0183 - City of Avondale
Infrastructure, Alteration
Conception
$900,000 est. value
Tolleson, AZ 85353

Old Town Avondale Phase III Improvement - T0200 - City of Avondale
Infrastructure
Conception
$13,994,000 CJ est. value
Avondale, AZ 85323

Last Updated 02/27/2023 06:12 PM
Project Title

RFP D/B - Drilling and Completion of a Portable Domestic Well at Black River Pump Station

Physical Address View project details and contacts
City, State (County) San Carlos, AZ 85550   (Gila County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Request for Proposals (RFPs), Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The San Carlos Apache Tribe- Black River Pump Station (BRPS) is requesting proposals from firms for A & E Design build/Water Well Drilling project. This is a request for A & E design build/ drilling and completion of a portable domestic well at Black River Pump Station, located on the San Carlos Apache Reservation, San Carlos, Arizona. The scope of work covered by these technical specifications consists of: (1) A & E design for water well drilling, (2) installing surface casing; (3) drilling, (4) installation of the casing, screen, pit less adapter, annular materials; (5) well development; (6) permanent pump installation; (7) well testing. For further information, contact Oliver Talgo, Jr., BRPS Manager at P. O. Box 711, Peridot Shopping Center, Suite #106, Peridot, Arizona 85542. Email at oliver.talgojr@scat-nsn.gov., phone number 928-475-4747.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents