Similar Projects
Last Updated | 04/07/2023 12:03 AM |
Project Title | RFQ Contractor - Ridgeland Pump Station project |
Physical Address | View project details and contacts |
City, State (County) | West Valley City, UT 84119 (Salt Lake County) |
Category(s) | Commercial, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Warehouse/Storage |
Contracting Method | Competitive Bids |
Project Status | Request for Qualifications, Construction start expected June 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $4,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Ridgeland Pump Station project will replace and upgrade the Ridgeland Booster Pump Station and generator. The existing water storage tank/reservoir and storage building onsite will remain. The following existing infrastructure will be demolished and relocated: control valve shed, booster pump station building and generator building. Additionally, the existing refueling station will be relocated. The site improvements include adding stormwater detention basins and a tie-in from them to West Valley City's stormwater system. The project also includes a new 16-inch waterline onsite and removing existing 14-inch asbestos cement pipe. Finally, the project includes various site work and yard piping. The project will be implemented within the footprint of the existing site. The project is needed to upgrade outdated facilities that are well beyond their useful life due to their age and, thus, create an operational risk for the District. Construction of the project is anticipated to begin Spring 2023, pending Division of Drinking water design and environmental approval. The electrical panel and PLC will be manufactured by APCO. This project is likely using State Revolving Funds, and thus will need to adhere to federal requirements for all materials and equipment and wages. This includes Davis Bacon wages and other BABA requirements. End of question and answer period March 17, 2023 Notice of Award April 18, 2023 Contract Agreement April 25, 2023 Notice to Proceed April 25, 2023 substantially complete on or before April 16, 2024 Date of Final Completion May 16, 2024 MBE (6.0%), WBE (6.9%) Confirmed shortlist |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |