Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Douglas County Health Center COVID-19 HVAC Upgrades Phase II
Alteration
Results
Omaha, NE 68105

Edith Abbott Memorial Library - Air Handler Replacement
Alteration
Results
Grand Island, NE 68801

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

NWS-CR Geothermal Heating, Ventilation, and Air-Conditioning Conversions
Term Contract
Results
$500,000 to $1,000,000 est. value
Lincoln, IL - Indianapolis, Syracuse, IN - Goodland, Wichita, KS - Jackson, KY - Grand Rapids, Marquette, MI - Duluth, MN - Pleasant Hill, MO - Bismarck, Grand Forks, ND - Hastings, NE - Aberdeen, SD - La Crosse, WI

District Wide HVAC Maintenance Service
Term Contract, Alteration
Post-Bid
Gretna, NE

Cooling Tower Repair-Fall 2021
Alteration
Results
Grand Island, NE

Annual Supply Daiken Heat Pumps
Term Contract
Post-Bid
Lincoln, NE

Bluff Road Landfill Facility HVAC Improvements
Alteration
Results
Lincoln, NE 68517

Cooling Tower Repair B451 - Offutt AFB
Term Contract
Post-Bid
Offutt AFB, NE

Theresa Street WRRF A3 Pump Station HVAC, Roof, and Misc. Building Improvements
Renovation, Alteration
Results
Lincoln, NE 68521

B88 And B123 Ductwork Cleaning
Term Contract
Post-Bid
Offutt AFB, NE

B451 Chiller Overhaul
Term Contract
Post-Bid
Offutt Air Force Base, NE

Cooling Tower Media Replacement
Alteration
Post-Bid
Offutt AFB, NE

Reported 02/02/2022 12:00 AM
Project Title

Westside High School Water Source Heat Pump Replacement Phase III

Physical Address View project details and contacts
City, State (County) Omaha, NE 68114   (Douglas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to the following major elements: Removal of the existing WSHPs; Removal of existing heat pump loop piping and accessories; General demolition to accommodate project; Installation of new WSHPs; Installation of new WHSP coil packages (piping and accessories); Installation of new temperature controls for each WSHP; Commissioning new equipment and controls; Electrical modifications to accommodate new mechanical equipment; General Construction to accommodate new mechanical equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents