Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Currie Parkway Bridge: Rehabilitation - City of Midland
Renovation, Alteration
Conception
Less than $460,000 est. value
Midland, MI 48640

Renovate Sewer Systems
Design
$250,000 to $500,000 est. value
Munising, MI

White Elephant Detention Basin Improvement Phase 2
Infrastructure
Bidding
$200,000 est. value
Sturgis, MI

Septage Holding Tanks Replacement Project
Infrastructure
Bidding
$300,000 est. value
Smiths Creek, MI

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

Herbison Road Sewer Lining
Results
Dewitt, MI 48820

Wastewater Collection System Contractor of Record
Term Contract
Results
Brighton, MI

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

PNC Bank Branch No. B839
Renovation
Construction
Wyoming, MI 49509

2022 Sanitary Sewer Cleaning and CCTV Investigation
Infrastructure
Bidding
Ecorse, MI 48229

Site Improvements
Post-Bid
Battle Creek, MI 49037

Excavation and Dirt Moving Services
Term Contract
Results
Mason, MI 48854

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

Last Updated 07/15/2022 01:06 AM
Project Title

Force Main Replacement - Griswold LS to Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Hart, MI   (Oceana County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Structures Water / Sewer Site Work Documents Sent to Scan We've obtained and are currently processing project documents 8 Plans 9 Specifications 0 Addenda 2 Other From Prein & Newhof - Muskegon Cost $120.00 ($0.00 Refund) Notes Hard copy drawings and specifications are available for the fee of $120.00 dollars. Prein&Newhof Plan Room members who want to purchase the hard copy of the drawings only, may do so for $36.00 dollars. A $15 dollar charge will be added to all mailed drawings and/or specifications. Fees are payable by cash or check only and are not refunded. Location Multiple Locations, Hart, MI 49420 US Description Site work for a water / sewer project in Hart, Michigan. Completed plans call for site work for a water / sewer project. The project consists of furnishing all material and constructing the following: 3440 feet of 18" HDPE Sanitary Force Main Installed by Open Cut 755 feet of 18" HDPE Sanitary Force Main Installed by HDD Including all necessary appurtenances and restoration. Drawings and specifications are available portal or at the Grand Rapids office of Prein&Newhof after Monday, April 18, 2022. Electronic drawings, specifications and bidding documents will be accessible/available only to those Bidders who are active members of the Prein&Newhof Plan Room. Bidder assumes sole risk for any project specifications and drawings, electronic or hard copy, obtained other than directly from Prein&Newhof. The work to be performed under this contract will be financed and paid for by the City of Hart and The Michigan Economic Development Corporation in cooperation with the Community Development Block Grant program. Conditions of employment shall be in accordance with the requirements of federal prevailing wage rates, Segregated Facility, Section 3 of the HUD Act of 1968, Section 109 and Equal Opportunity. Prevailing wage rates apply to this project. A bid bond, certified check, or cashier's check payable to City of Hart in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of ninety (90) days after the receipt of bids. The Work will be substantially complete by Friday, March 31, 2023. The project shall be complete and ready for final payment by Friday, June 2, 2023. See agreement and progress clause regarding additional milestones.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents