Last Updated | 05/14/2021 09:11 AM |
Project Title | 2021-03 Street Milling and Resurfacing Project |
Physical Address | View project details and contacts |
City, State (County) | Parkersburg, WV (Wood County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The general scope of work for this project is as follows: a. Edge mill 1.5 inch of existing asphalt from face of curb to a distance adequate to provide proper tie-in with in the specified length and according to the location key. b. Milling may be required on streets that are “overlay only” at driveways, around inlets, etc. c. Place 0.5 inch hot laid bituminous asphalt stratch/leveling course in the stated areas after the pavement removal is completed. d. Place 1.0 inch hot laid bituminous asphalt wearing course in the stated areas after application of stratch/leveling course is completed. e. Adjust water valve, manholes, and inlets where applicable. The adjustment will be completed by the use of precast iron risers similar to those manufactured by East Jordan or equal. Sealing on the inside of the riser ring will be required for all sanitary manholes. See attached specification, an equivalent product may be used. f. Included in this contract is a quantity for reconstruction of failed sections of existing road. This work will be paid by Square Yard (SY). This price shall include: excavation to a depth of 18”; placement of 8” deep #3 aggregate; placement of 2.5” deep #57 aggregate; placement of 6” thick asphalt base material (or concrete); and placement of 1.5” thick asphalt wearing material. All material is to be properly compacted. g. Provide a detailed Maintenance of Traffic (MOT) plan for work to be done on Murdoch Avenue at least two weeks prior to commencing said work. The MOT must minimize traffic disturbance. a. NOTE: The paving indicated on Murdoch Avenue shall be the first road completed under this contract. Work on Murdoch Avenue shall commence as soon as possible once Notice to Proceed is issued. h. After completion of road resurfacing the contractor shall reinstall pavement marking (centerlines and lane lines) on Murdoch Avenue. Placement of pavement markings shall be coordinated based on locations of existing lines/dashes to ensure markings are in compliance with the current WV DOH specifications |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |