Similar Projects
SH-51 - Pavement Rehabilitation
Infrastructure
Conception
$3,000,000 CJ est. value
Mannford, OK 74044

SH-51 - Pavement Rehabilitation
Infrastructure
Conception
$3,000,000 CJ est. value
Mannford, OK 74044

Pavement Rehabilitation - SH 66
Infrastructure
Design
$5,269,170 CJ est. value
Bristow, OK 74010

Pavement Rehabilitation - SH 66
Infrastructure
Design
$5,269,170 CJ est. value
Bristow, OK 74010

Bridge Repair Turner Turnpike
Infrastructure
Bidding
$800,000 CJ est. value
Bristow, OK 74010

Bridge Repair Turner Turnpike
Infrastructure
Bidding
$800,000 CJ est. value
Bristow, OK 74010

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Kum & Go #2362 / Tulsa
New Construction, Infrastructure - 5,620 SF
Post-Bid
$2,000,000 CJ est. value
Tulsa, OK 74133

Citywide ADA Transition Plan Implementation
Infrastructure
Results
$1,556,408 est. value
Tulsa, OK

Slabjacking and Subsealing Services
Infrastructure
Results

Basin N04 Sanitary Sewer Rehabilitation
Infrastructure
Construction
$1,828,039 CJ est. value
Sapulpa, OK 74066

2019 Bond - Edison Elementary Renovations - Bristow Public Schools
Renovation, Infrastructure
Pending Verification
$546,293 CJ est. value
Bristow, OK 74010

2019 Bond - Edison Elementary Renovations - Bristow Public Schools
Renovation, Infrastructure
Pending Verification
$546,293 CJ est. value
Bristow, OK 74010

Pavement Rehabilitation - SH 48
Infrastructure
Conception
$5,450,000 CJ est. value
Bristow, OK 74010

Safety Improvement
Infrastructure
Design
$3,501,080 CJ est. value
Sapulpa, OK 74066

Last Updated 01/11/2023 05:03 PM
Project Title

New Pre-K Center - 2019 Bond - Bristow Public Schools

Physical Address View project details and contacts
City, State (County) Bristow, OK 74010   (Creek County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,354,946 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase One - To construct, equip, furnish and/or acquire a new Pre-K Center costs More exact scope and number of future phases will be revealed at a future date. As of January 11, 2023, the bond vote passed. A design team has not been identified and a construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents