Similar Projects
Signing and Delineation
Infrastructure
Conception
$1,019,000 CJ est. value
Martin, SD 57551

Signing and Delineation
Infrastructure
Conception
$1,019,000 CJ est. value
Martin, SD 57551

Joint and Spall Repair - US 18
Infrastructure
Design
$2,569,000 CJ est. value
Martin, SD 57551

Joint and Spall Repair - US 18
Infrastructure
Design
$2,569,000 CJ est. value
Martin, SD 57551

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Bennett County Hospital Remodel/Addition
Addition, Demolition, Renovation, Infrastructure - 19,650 SF
Bidding
$10,000,000 CJ est. value
Martin, SD 57551

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Bid Packages for a Addition for the Bennett County School District 3-1
Addition, Demolition, Infrastructure - 17,678 SF
Post-Bid
$3,000,000 CJ est. value
Martin, SD 57551

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pulling Up Shoulders and Rebuilding Roads
Infrastructure
Results
SD

Grading, Interim Surfacing
Infrastructure
Conception
$17,345,000 CJ est. value
Martin, SD 57551

Rout and Seal
Infrastructure
Bidding
$400,000 CJ est. value
Martin, SD 57551

Grading, Interim Surfacing, Replace Str RCBC
Infrastructure
Conception
$36,739,000 CJ est. value
Martin, SD 57551

Last Updated 02/17/2023 08:07 AM
Project Title

AC Surfacing - US 18

Physical Address View project details and contacts
City, State (County) Martin, SD 57551   (Bennett County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $5,708,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US18 - Fm the E Jct of SD73 to W of Antelope Road/242 Ave Length 11.3 As of February 17, 2023, the project is in Conceptual status. Anticipated Construction year is 2026. SDDOT - AC Surfacing - US 18 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents