Similar Projects
Allenberry Resort Community
New Construction
Conception
Boiling Springs, PA 17007

Southwood Crossing E Phase 4
New Construction
Design
Shippensburg, PA 17257

Putt Lane Subdivision
New Construction, Demolition
Design
Enola, PA

Solid Waste Collection, Transportation and Disposal Services and Recycling Collection, Transportation and Processing Services from Dwelling Units within Hampden Township
Term Contract
Post-Bid
Mechanicsburg, PA 17055

Shippensburg Village Single Family Homes Phase 3
New Construction - 32,240 SF
Construction
Shippensburg, PA 17257

Tatersall-West Winding - Phase I
New Construction - 612,375 SF
Construction
Mechanicsburg, PA 17055

Southwood Crossing - Parcel E Phase 5
New Construction - 56,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Shippensburg, PA 17257

Southwood Crossing - Parcel E Phase 6
New Construction - 35,200 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Shippensburg, PA

Laurel Forge - Phase 1
New Construction - 405,081 SF
Design
Boiling Springs, PA

Cumberland Crossings Cottages Expansion
New Construction - 16,066 SF
Construction
$500,000 to $1,000,000 CJ est. value
Carlisle, PA

Hickory Ridge
New Construction
Pending Verification
Carlisle, PA 17015

Laurel Forge - Phase 2
New Construction
Design
$10,000,000 CJ est. value
Boiling Springs, PA

Cumberland Preserve
New Construction
Construction
Carlisle, PA 17015

Southwood Crossing - Parcel E - Phase 7
New Construction
Pending Verification
Southampton, PA

Green Lane Meadow Development - Master Plan
New Construction - 412,000 SF
Design
New Cumberland, PA 17070

Last Updated 07/21/2022 09:45 AM
Project Title

Deerfield - Phase 2C

Physical Address View project details and contacts
City, State (County) Shippensburg, PA 17257   (Cumberland County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method
Project Status Construction Complete as of fourth quarter 2021,
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

18 Single-Family Homes, Approximately 1,372 to 2,289 SF New Construction, 81.63 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents