Similar Projects
127Eaw22r0025 - Stanislaus Multi CG Well Water System
Term Contract
Design
$250,000 to $500,000 est. value
CA

Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Upgrade and Repair Three Existing Pump Plants
Infrastructure
Bidding
$5,500,000 est. value
CA

Water Treatment Plant Backwash and Recycled Water Capacity Project
Infrastructure
Bidding
$1,400,000 est. value
Folsom, CA 95630

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

EWWTP Well 3 Drilling
Term Contract
Bidding
Elmira, CA 95625

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Storm Water Drain Water Pump Services
Infrastructure
Bidding

Big Horn Groundwater Well 7 Downhole Construction
Infrastructure
Post-Bid
$1,280,000 est. value
Elk Grove, CA 95757

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Results
Elk Grove, CA

6-Inch Self-Priming Trailer Mounted Pump
Alteration
Bidding
Hemet, CA 92545

Reported 03/24/2022 12:00 AM
Project Title

Storm Water Pump and Motor Maintenance Services

Physical Address View project details and contacts
City, State (County) Mill Valley, San Rafael, Tiburon, CA 94941   (Marin County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To remove, inspect, maintain and at the written direction of the District, repair, rebuild or replace a total of six (6) pumps, four (4) motors and one right-angle gearhead, throughout the district, in Flood Control Zones 1, 3, 4 and 7. The Proposer, who enters into a contract with the District, shall be required to remove, examine, evaluate, report on, repair, perform several maintenance tasks and re-assemble a total of six (6) pumps, four (4) motors and one right-angle gearhead. Pump Station Locations Farmer’s Pump Station, Novato (On the levee east of Novato Creek, north of Hwy 37 & east of Hwy 101). Lynwood Pump Station, Novato (On the levee west of Novato Creek, north of Hwy 37 & east of Hwy 101). Cardinal Pump Station, 228 Cardinal Rd, Tam Junction, Mill Valley. Ryan Creek Pump Station, 451 Sycamore Av, Mill Valley (Behind the Mill Valley Middle School). Pamela Court Pump Station, 251 Tiburon Blvd, Tiburon. SV3 Pump Station, 99 Vendola Dr, San Rafael (Santa Venetia Area)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents