Similar Projects
Single-Family Homes, Site Development Construction Project Lead, Lowell, MA 01854 (Middlesex County)
Last Updated | 01/27/2023 06:09 AM |
Project Title | QSP 2022-17 58 Dublin St. Ramp & Railing Repair |
Physical Address | View project details and contacts |
City, State (County) | Lowell, MA 01854 (Middlesex County) |
Category(s) | Heavy and Highway, Residential |
Sub-Category(s) | Single-Family Homes, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $9,800 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Pursuant to the attached specifications and drawings scope to include repair cracked and uneven surfaces, resurface ramps and landings, repair holes surrounding post bases, po9sition, brace, secure and paint metal railing and posts, repair and reseed any disturbed pavement and landscape. The Lowell Housing Authority is seeking pricing from Contractors interested in the repair and resurfacing of a ramp, securing and painting of metal railings and posts at 58 Dublin Street. Concerns regarding completion date shall be forwarded to the CPO listed. Interested bidders may visit the site at their own leisure. Ramp is located at 58 Dublin Street, Lowell, MA 01854. Deadline to submit written questions: November 2, 2022, 2022 by 2:00 PM. The Lowell Housing Authority has identified a sole point of contact with bidders for the purpose of this QSP. Any attempt to contact any other LHA employee or to circumvent these procedures in any manner may be grounds for disqualification of the bidder from the procurement process. All questions and concerns must be submitted in writing by the date stated above to rbrousseau@lhma.org. The Lowell Housing Authority is seeking pricing from Contractors interested in the repair and resurfacing of a ramp, securing and painting of metal railings and posts at 58 Dublin Street. Weather permitting, the project should be completed by November 30, 2022. Concerns regarding completion date shall be forwarded to the CPO. In the event previously unknown hazardous materials are discovered by the Contractor, the Contractor shall immediately suspend work in the specific location of the hazardous material and immediately notify the Housing Authority. All invoices for this project shall be submitted to Lowell Housing Authority, Attention: Brenda O'Keefe, 350 Moody Street, Lowell, MA 01854; provided the equipment, materials, supplies and/or services have been delivered/rendered as directed and accepted by the Lowell Housing Authority. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |