Similar Projects
City of Tipton Downtown Park Phase I
Demolition, Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Tipton, IN 46072

City of Tipton Downtown Park Phase I
Demolition, Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Tipton, IN 46072

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 CCPP Milling, Leveling and Resurfacing
Infrastructure
Post-Bid
Tipton, IN

2021-2 Community Crossing Matching Grant Project
Infrastructure
Results
Tipton, IN

Tri-Central Maintenance Barn Addition REBID
Addition, Demolition, Infrastructure - 12,020 SF
Results
$599,500 CJ est. value
Sharpsville, IN 46068

Superstructure Replacement on SR 28, SR 32, and SR 1 - 1903 - Indiana Department Of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$15,179,458 CJ est. value
Tipton, IN 46072

Superstructure Replacement on SR 28, SR 32, and SR 1 - 1903 - Indiana Department Of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$15,179,458 CJ est. value
Tipton, IN 46072

RFP Engineering - Project Development Services Pavement Replacement (Small Town Reconstruction) in the Town of Tipton
Infrastructure
Post-Bid
$9,774,151 CJ est. value
Tipton, IN 46072

Tipton County 2022-2 CCMG Project CR 560 W / CR 550 W From SR 28 to Division Road
Infrastructure
Results
$926,046 CJ est. value
Tipton, IN 46072

New Public Works Facility - Bid Packages 2 to 25
New Construction, Infrastructure
Post-Bid
$5,866,000 CJ est. value
Tipton, IN 46072

Last Updated 05/04/2023 04:31 PM
Project Title

CCMG 2022-2 Paving Project

Physical Address View project details and contacts
City, State (County) Tipton, IN 46072   (Tipton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of curb ramp replacement, patching, milling, structure adjustment, paving and pavement markings for streets and all other work necessary for roadway restoration and as included in the 2022 Community Crossing Paving Program contract documents. Each bid shall be accompanied by a cashier's or certified check, drawn on an acceptable bank, OR an acceptable bidder's bond in the amount of no less than 10% of the total amount of the bid, payable to the City of Tipton, Indiana. The Contractor's Bid for Public Work ~ Form 96 shall be filled out and included with the contractor's bid. The bidder to whom a contract for work is awarded will be required to furnish a Performance Bond executed on the specified forms and acceptable to the City, in the amount of one hundred percent (100%) of the Contract. The bidder (proposer) must supply all information required by the bid proposal form. Partial payment will be made monthly based on an approved payment requisition. The Contractor and all subcontractors will be required to comply with required Federal and State labor regulations including Equal Employment Opportunity, EVerify, Non-segregated Facilities and Affirmative Action requirements. The City of Tipton, Indiana reserves the right to reject any and all proposals or parts there-of and to waive all responsibility for irregularities in bids. Bids may be held by the City of Tipton, Indiana, for a period of not to exceed sixty (60) days from the date of the opening of the bids for the purpose of reviewing the bids and investigation of the qualifications of bidders prior to awarding of the Contract. It is anticipated that the contract will be awarded at the next Board of Public Works meeting.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents