Similar Projects
Murphy #7200/7886 / Eastman
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$1,500,000 CJ est. value
Eastman, GA 31023

FY 2022 CDBG Proposed Storm Drainage Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Eastman, GA 31023

FY 2022 CDBG Proposed Storm Drainage Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Eastman, GA 31023

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Jacks / Eastman
New Construction, Infrastructure - 3,275 SF
Post-Bid
$1,000,000 CJ est. value
Eastman, GA 31023

Fiscal Year 2021 Dodge County T-Splost Part 2
Infrastructure
Results
GA

Dodge State Prison Drainage Improvements Phase 2
Infrastructure
Results
Chester, GA 31012

2020-2022 LMIG, Street Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Eastman, GA 31023

Repaving at Middle School
Infrastructure
Results
Eastman, GA 31023

2020-2022 LMIG Street Improvements
Infrastructure
Post-Bid
$220,000 CJ est. value
Eastman, GA 31023

Fiscal Year 2022 Dodge County T-Splost Part 2
Infrastructure
Results
Eastman, GA

Runway 2/20, Apron, and Stub Taxiway Rehabilitation at Heart of Georgia Regional Airport
Infrastructure
Results
$3,200,000 CJ est. value
Eastman, GA 31023

Sewer Rehabilitation & Replacement in the Legion Drive Basin
Infrastructure
Results
$2,686,924 CJ est. value
Eastman, GA 31023

Water Meter Replacement
Infrastructure
Results
$896,756 CJ est. value
Eastman, GA 31023

Taxiway A Rehabilitation at Heart of Georgia Regional Airport
Infrastructure
Results
$1,649,286 CJ est. value
Eastman, GA 31023

Last Updated 09/06/2023 10:14 PM
Project Title

Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 165

Physical Address View project details and contacts
City, State (County) Eastman, GA 31023   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

7.780 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on Sr 165 Beginning at Sr 132 and Extending South to Sr 30. County: Telfair District 5 - Jesup, Area Office 1 - Baxley All Questions and Comments Must Be Submitted by the Close of Business of the Friday Two Weeks Before the Letting. All Questions and Comments Received After the Friday Before the Week of the Letting Will Be Documented, but a Response Will Not Be Provided. For Those Contractors Who Are Currently Prequalified as a GDOT Construction Prequalified Contractor or Registered Subcontractor Through GDOTs Construction Bidding Administration Office, and Want to Be Prequalified to Perform Maintenance Projects Under the Routine Maintenance Services Program, There is Now a Modified Prime Contractors Application Form Available. W E Welcome You to Participate. The Application Form and All Applicable Documents, Resources and Other Guidance May Be Found on the GDOT at Electronically. Proposals Shall Only Be Submitted Electronically as Specified in the Specifications; and Shall Be Accompanied by a Proposal Guaranty in the Indicated Amount in the Form of a Certified Check, Cashiers Check or Bid Bond on the Form Issued by the Department. This Advertisement is Merely an Invitation for the Submission of Bids Which Will Be Considered as Offers for Performance of Work by the Submitting Party. The State Reserves the Right to Reject Any or All Bids. The Surety for Bid Bonds and Performance and Payment Bonds Shall Be a Company Acceptable as Surety on Federal Bonds and Listed in the Current Federal Register and Licensed in the State of Georgia. For Any Web Site-related Issues, Please Contact the Following Individual: William Dunwoody: 404-631-1147 Should You Have Questions or Need Assistance, Contact William Dunwoody at 404-631-1147. For Amendment Related Questions or Issues Regarding Projects Advertised, Please Contact the Following Individual: Tamara Crawford: 404-631-1728 Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. Questions or Comments Call (404) 631-1147 GADOT - 032 - Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 165

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents