Similar Projects
Bid Package No. 1 Renovations/Alterations to Countryside, Harrington, Hartford, Hillside, Parkway and Springville Schools; Bid Package No. 2 Addition/Alterations/Renovations to Fleetwood and Larchmont Schools
Renovation
Construction
Mount Laurel, NJ 08054

Additions, Alterations and Renovations at Northern Burlington County Regional High School – Phase 1
Renovation
Results
$2,500,000 est. value
Columbus, NJ 08022

Ashbrook Elementary and Lumberton Middle School Renovations
Renovation
Construction
Lumberton, NJ 08048

Maple Shade High School Renovations and Additions
Renovation, Addition
Construction
$14,815,000 est. value
Maple Shade, NJ 08052

Construction Management Services
Post-Bid
Delran, NJ 08075

Security Office and Exterior Bollards
Results
Less than $160,000 est. value
Vincentown, NJ 08088

Renovations at the Rancocas Valley Regional High School District Annex
Renovation
Results
$1,570,185 est. value
Mount Holly, NJ

Rancocas Valley Regional High School Guidance Suite, Toilet Rooms and Door Renovations
Renovation
Construction
$1,938,000 est. value
Mount Holly, NJ

Lenape Regional High School District Office VRF Installation
Results
Shamong, NJ 08088

Pre-Kindergarten Restrooms Alteration Located at Mildred Magowan School
Renovation
Results
Less than $390,000 est. value
Edgewater Park, NJ 08010

Garfield Park Academy Addition
Addition
Post-Bid
Willingboro, NJ 08046

Riverside High School and Middle School Alterations - General Construction
Bidding
Riverside, NJ 08075

Disaster Recovery Services
Results

New Greenhouse at Northern Burlington County Regional High School
New Construction
Results
$700,000 est. value
Mansfield, NJ 08022

Thomas Hopkins Art Room and Guidance Office Renovation
Renovation
Bidding
Burlington, NJ 08016

Last Updated 03/04/2021 10:19 AM
Project Title

Addition, Alterations and Renovations at Northern Burlington County Regional High School - Phase 3

Physical Address View project details and contacts
City, State (County) Columbus, NJ 08022   (Burlington County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,480,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract(s): Separate Bids will be received for: Contract No. 1 – General Construction Work (C009) Contract No. 2 – Structural & Miscellaneous Steel Work (C029) Contract No. 3 – HVACR Work (C032) Contract No. 4 – Plumbing Work (C030) Contract No. 5 – Electrical Work (C047) Contract No. 6 – Combined Single Overall Contract comprising Contracts 1 though 5 Project Description: The Project involves one addition to the existing buildings, which will house a Child Development Classroom with self-contained Toilet Room and a Vocal Music Room with Storage, Office and Practice Rooms. The Addition is approximately 5500 square feet. Other project scope areas include: Renovating existing Chemistry Classroom with new casework and equipment. Altering existing Business Office, Facilities Office and Publishing Office to become new Guidance Offices. Altering existing West Cafeteria to add two Serving Kiosks as well as replacing existing counter shutters at the existing serving line. Altering existing Graphics Lab into two Classrooms. Altering existing Floral Classroom into a Large Group Instruction Room with folding partition. Altering portion of the existing Library into four Classrooms, Publishing Office and Corridor. (See also Alternate Bid #2 Work.) Altering three existing Classrooms into Biology and Floral Classrooms. Altering three existing Classrooms into Graphics Classroom and Applied Tech. Alterations to existing building at the connections of the new addition and indicated renovations and shall include Environmental / hazardous material abatement work. All plumbing, mechanical and electrical system Work as indicated on the MEP drawings. Fire safing of any penetration(s) or modification(s) made to fire rated walls or other assemblies. All indicated casework and equipment. All other indicated work. The following scope items will be under Alternate Bids: Alternate Bid #1 – Altering the existing Faculty Dining Room (East Building) into two Toilet Rooms. Alternate Bid #2 – Altering the remainder of the existing Library into Offices for the Board of Education, Superintendent, Business Administrator and Facilities Department. Alternate Bid #3 - Altering and expanding the existing Theater Arts Classroom with new Storage and Practice and Dressing Rooms. Alternate Bid #4 – Altering two existing Classrooms into Biology Classroom and Prep Room. Alternate Bid #5 - Replacement and Upgrade of selected casework including sinks in two Physics Classrooms. Alternate Bid #6 – Replacement of indicated HVAC Equipment at existing West Main Office. Alternate Bid #7 - Replacement of indicated HVAC Equipment at existing East Main Office and Nurse. Alternate Bid #8 - Replacement of indicated HVAC Equipment at existing East Gymnasium and Locker Rooms. Alternate Bid #9 – Construction of new World Language Classroom and JROTC Room. The Project will have five Prime Contractors: General, Structural, Plumbing, HVACR and Electrical.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents