Similar Projects
SPPS Jie Ming BP #4 Coiling Doors and Grilles
Renovation
Sub-Bidding
$100,000 CJ est. value
Saint Paul, MN 55116

SPPS Jie Ming BP 4 Carpet and Resilient Flooring
Renovation
Sub-Bidding
$200,000 CJ est. value
Saint Paul, MN 55116

Industrial Testing Master Contract
Post-Bid
MN

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 WS 03A - Concrete
Renovation
Construction
$700,000 CJ est. value
Saint Paul, MN 55116

SPPS Jie Ming Mandarin Immersion Part 3 BP #3
Renovation
Construction
$3,000,000 CJ est. value
Saint Paul, MN 55116

Jie Ming Mandarin Immersion Academy Addition and Renovation - Part 2 Bid Package
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$31,000,000 CJ est. value
Saint Paul, MN 55116

Environmental Assessment and Abatement Master Contract
Alteration
Post-Bid
Saint Paul, MN

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 - Bid Package#3 (Electrical Temporary Conditions)
Renovation
Construction
$119,200 CJ est. value
Saint Paul, MN 55116

Demolition for 864 Marion Street
Demolition, Infrastructure
Sub-Bidding
$40,000 CJ est. value
Saint Paul, MN 55117

Master Contracts for Environmental Assessment and Investigation Services
Term Contract
Post-Bid
Saint Paul, MN

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Earthwork, Utilities, Building Demolition
Infrastructure - 20,000 SF
Construction
$1,086,550 CJ est. value
Saint Paul, MN 55116

SPPS - Jie Ming Mandarin Immersion Addition and Renovation - BP #4 (Partial Rebid)
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$31,000,000 CJ est. value
Saint Paul, MN 55116

Water Contamination Testing
Term Contract
Post-Bid
Mounds View, MN

Jie Ming Immersion Academy Addition and Renovation - Part 2, Bid Package #3
Addition, Demolition, Renovation, Infrastructure - 20,000 SF
Construction
$280,000 CJ est. value
Saint Paul, MN 55116

Last Updated 08/11/2022 04:34 PM
Project Title

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Selective Demolition and Temporary

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55116   (Ramsey County)
Category(s) Education, Single Trades
Sub-Category(s) Environmental, Vocational School
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $78,500 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project No - 21269, 21005927.00, R21-4117.000 Jie Ming Selective Demolition and Temporary Conditions. Deadline for contractor questions (in GetAll) 5/26/2022 2:00pm local time. Construction began on July 21, 2022 and is expected to be completed in 2024.

Details

20,000 SF.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents