Similar Projects
Wisconsin 175 Improvements - Wisconsin Department of Transportation
Infrastructure
Conception
$6,686,850 CJ est. value
Milwaukee, WI 53224

Redevelopment Opportunity - 1214 Milwaukee Avenue - City of South Milwaukee
New Construction, Infrastructure
Conception
$3,474,055 CJ est. value
South Milwaukee, WI 53172

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

Fox Crossing Cold Spring Road Reconstruction
Infrastructure
Post-Bid
$470,000 CJ est. value
Greenfield, WI 53228

1436 East Forest Hill Avenue Soil Cap Addition
Infrastructure
Post-Bid
Oak Creek, WI 53154

KP - 55 Kilbourn Park Improvements
Renovation, Infrastructure
Results
$1,356,000 est. value
Milwaukee, WI 53212

East Plant Gallery Concrete Catwalk Repairs
Infrastructure
Results
$39,985 CJ est. value
Milwaukee, WI 53207

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Oakview Parkway Industrial Building
New Construction, Infrastructure - 130,710 SF
Construction
$90,000,000 CJ est. value
Oak Creek, WI 53154

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Multi-Family Oak Creek Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Oak Creek, WI 53154

Jackson Park - W40009 - Milwaukee Metropolitan Sewerage District
Infrastructure
Conception
$41,647,900 CJ est. value
West Milwaukee, WI 53215

Cornerstone Village Wauwatosa
New Construction, Infrastructure - 9,796 SF
Design
$31,000,000 CJ est. value
Wauwatosa, WI 53213

IH 41 Airport Freeway
Infrastructure
Post-Bid
$66,290,749 CJ est. value
Milwaukee, WI 53202

Last Updated 08/18/2023 09:09 AM
Project Title

ESSER III Relief Funds/Bid Packages

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53202   (Milwaukee County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Expected, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Integrated Project Development (IPD) Contractors Under Contract to Milwaukee Public Schools (MPS) Will Be Soliciting Bids for Construction Work Funded by the Elementary and Secondary School Emergency Relief (ESSER) Funds. Projects May include mechanical or lighting upgrades; minor remodeling including painting and flooring; restroom upgrades; major remodeling projects, exterior site work projects; major upgrades to athletic facilities and many other types of projects. Contractors are encouraged to review the A/E Graphics on-line Plan Room often to see new bid opportunities. All contractor(s) and subcontractors(s) are subject to the current livable wage rate, in accordance with the City of Milwaukee Ordinance 310-13. Please note that these projects are funded by ESSER Federal funds; therefore, are subject to the payment of prevailing wages in accordance with the Federal Davis Bacon act. MPS HUB, COIN and Student Employment / Participation requirements are as identified within in the bidding documents. The right is reserved to reject any or all bids or to waive informalities. OFFICIAL ADVERTISEMENT Office of the Milwaukee Public Schools, DIVISION OF FACILITIES AND MAINTENANCE SERVICES, 1124 North 11th Street, Milwaukee, Wisconsin. INTEGRATED PROJECT DEVELOPMENT (IPD) CONTRACTORS under contract to Milwaukee Public Schools (MPS) will be soliciting bids for construction work funded by the ELEMENTARY AND SECONDARY SCHOOL EMERGENCY RELIEF (ESSER) FUNDS. The IPD Contractors under contract to MPS for ESSER II include: Nicholas & Associates, Inc. Performance Services, Inc. Selzer-Ornst Construction Co. LLC VJS/JCP Joint Venture III CHSBJ Milwaukee Team Projects May include mechanical or lighting upgrades; minor remodeling including painting and flooring; restroom upgrades; major remodling projects, exterior site work projects; major upgrades to athletic facilities and many other types of projects. Contractors are encouraged to review the A/E Graphics on-line Plan Room often to see new bid opportunities. All bids will be solicited or noticed on-line through A/E Graphics, Inc. This advertisement shall provide public notification of the potential for available bidding opportunities. Interested parties are encouraged to review the opportunities available on a regular basis. All contractor(s) and subcontractors(s) are subject to the current livable wage rate, in accordance with the City of Milwaukee Ordinance 310-13. Please note that these projects are funded by ESSER Federal funds; therefore, are subject to the payment of prevailing wages in accordance with the Federal Davis Bacon act. MPS HUB, COIN and Student Employment / Participation requirements are as identified within in the bidding documents. For all bids solicited through AE Graphics, Inc. the following applies: The bidding documents may be viewed and downloaded for free from A/E Graphics On-line Plan Room, at https://mps.aegraphics. com/. Hard copies may be obtained 7:30 A.M. to 5:00 P.M.; Monday through Friday from A/E Graphics, Inc.; 4075 North 124th Street, Brookfield, WI 53005; phone (262) 781-7744; fax (262) 781-4250. Hard copies require a deposit for Drawings and Specifications: $25.00; and if requested, a MAILING CHARGE: $35.00. Call A/E Graphics, Inc. for availability of bid documents for pick up. Plans and specifications will be loaned to a prospective bidder upon receipt of the deposit listed, which deposit will be returned upon surrender of the plans and specifications in good condition. Bid documents must be returned only to A/E Graphics, Inc. Pre-bid walkthroughs shall be as noted in bidding documentation. All questions should be submitted as noted in the bidding documentation. Submit bid forms per Instructions in the bidding documentation. The right is reserved to reject any or all bids or to waive informalities. Upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals at the bid opening through sign language interpreters or other auxiliary aids. Keith P. Posley, Ed.D. 2528226/8-14 Superintendent of Schools The method of Contractor Selection has not been Determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents