Similar Projects
Replacement of Lighting Control System in Building 4 at NSWCPD
Design
Philadelphia, PA

USP Canaan - Replace Powerhouse Boiler #1
Design
$250,000 to $500,000 est. value
Waymart, PA 18472

Timber Run Water Service - Electrical Construction
Infrastructure
Bidding
$400,000 est. value
PA 17752

Borough Office Building Renovations - Electrical Construction
Alteration
Bidding
Boyertown, PA 19512

Upgrades to Paralleling Switchgear at Allegheny County Jail
Post-Bid
Less than $150,000 est. value
Pittsburgh, PA 15219

Wire #18 Iron Soft Black 2 LB Spools
Post-Bid
Philadelphia, PA 19107

Replace Electrical Power Distribution System at Pittsburg Greenfield K-8 (Electrical Construction)
Results
Pittsburgh, PA 15007

Load Bank
Results
Chambersburg, PA

Pump Station 5 Part II Permit Improvements - Electrical/Controls Contract
Alteration
Bidding
Stroudsburg, Tannersville, PA 18372

J059--PM Generator/Load Bank Testing
Post-Bid
Pittsburgh, PA 15215

Electrical and Mechanical Services for Unit Renovations
Results
Harrisburg, PA 17103

Electrical Campsite Work
Alteration
Bidding
Snow Shoe, PA 16874

J041--Chiller Maintenance Philadelphia VAMC
Post-Bid
Philadelphia, PA

Weyandt/Walsh Hall Replacement - Electrical Construction
Results
$8,000,000 to $10,000,000 est. value
Indiana, PA 15705

Alterations and Additions to the Existing Church Building - Electrical
Alteration
Bidding
Clairton, PA 15025

Reported 07/30/2021 12:00 AM
Project Title

Bona Fide Mechanical and Electrical Construction

Physical Address View project details and contacts
City, State (County) Danville, PA   (Montour County)
Category(s) Single Trades
Sub-Category(s) Electric, Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the existing boiler for the Mid-Rise facility. Work includes removal of all components associated with the existing boiler and providing and installing new units complete with all ducting, conduit, piping, electronics, controls, etc. Removal of the existing boiler room ceiling and installation of a new gypsum board ceiling is also included.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents