Similar Projects
Carpenter Rd. Sewer Extension - 2022
Infrastructure
Bidding
$1,175,000 CJ est. value
Albany, OH 45710

Structural Steel Components
Term Contract
Sub-Bidding
Columbus, OH 43211

Steel Pipe Piles and Steel Pile Points
Term Contract
Sub-Bidding
Columbus, OH 43211

Plumbers for Replacement of Lead Service Lines on Private Property
Alteration
Post-Bid
Cincinnati, OH

Plumbing Maintenance and On-Call Services
Term Contract
Post-Bid
Kirtland, Painesville, Wickliffe, OH 44077

Capital Maintenance and Repair of City Facilities Plumbing
Alteration
Results
Cleveland, OH

Plumbers for Replacement of Lead Service Lines- Child Care
Infrastructure
Results
Cincinnati, OH

Fire Pump Replacement at Dorrell Manor
Renovation
Sub-Bidding
$200,000 CJ est. value
Toledo, OH 43614

Pipe and Pipe Fittings
Alteration
Post-Bid
Canton, OH

Summit County Jail HVAC and Plumbing Improvement Project
Alteration
Results
$10,260,000 est. value
Akron, OH 44311

Liberty Center Local Schools Varsity Gymnasium Building
Alteration
Post-Bid
Liberty Center, OH 43532

Woodville Township Fire Station - Plumbing Improvements
Alteration
Results
$138,000 est. value
Woodville, OH

Replace Domestic Water and Chilled Drinking Water Piping
Alteration
Post-Bid
$2,000,000 to $5,000,000 est. value
Cincinnati, OH 45220

Plumbing Maintenance Services UTC
Term Contract
Results
$20,000 est. value
Columbus, OH

Plumbers for Replacement of Lead Service Lines on Private Property
Term Contract
Post-Bid
$500,000 CJ est. value
Cincinnati, OH 45202

Last Updated 04/17/2023 05:06 PM
Project Title

East Fancy Street Water Main Replacement REBID

Physical Address View project details and contacts
City, State (County) Blanchester, OH 45107   (Clinton County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $564,473 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing approximately 2150' of existing 8" cast iron water main with 10" PVC C-900 water main, replacing of fire hydrants, and replacing of water services to the right-of-way line along E. Fancy St. between Broadway St. and the Fancy St. Water Tower. $553,875.00 for the base bid and $22,000.00 for alternate 1 Project Funding: HB 168 Bid Bond: 10% Performance Bond: 100% Payment Bond: 100% The Work will be substantially complete on or before May 15, 2024, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before May 31, 2024.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents