Similar Projects
Dooley Court
Bidding
$1,097,130 est. value
Salt Lake City, UT 84102

Lehi City Lower School House Springs
Post-Bid
Lehi, UT 84043

Golf Course Sewer Replacement
Post-Bid
Saratoga Springs, UT 84045

Waste Pumping
Results
Provo, UT 84606

2019 Sewer Rehabilitation
Results
$1,700,000 to $1,900,000 est. value
Orem, UT 84057

500 East 600 South Design
Post-Bid
Salem, UT 84653

Salem City North Main Sewer
Results
$350,000 to $400,000 est. value
Salem, UT 84653

Pole Canyon Water Line and Force Main Sewer
Post-Bid
Eagle Mountain, UT

Springville City 1120 South Sewer Project
Results
Less than $200,000 est. value
Springville, UT 84663

Drain Cleaning Services
Term Contract
Post-Bid
Draper, Ogden, Orem, Salt Lake City, West Valley City, UT 84020

2020 Sewer Lining Project
Results
Less than $100,000 est. value
Highland, UT 84003

Sewer Lateral Reinstatement and Robotic System
Post-Bid
Orem, UT 84057

West Interchange Sewer Trunkline Design and Construction Management
Term Contract
Results
$7,000,000 est. value
Spanish Fork, UT 84660

2020 Manhole Rehabilitation Project
Post-Bid
Eagle Mountain, UT

Mt. Vista Parkway Sewer Reroute 2020
Results
Provo, UT 84606

Reported 10/14/2020 12:00 AM
Project Title

30" Sewer Cipp Lining

Physical Address View project details and contacts
City, State (County) Eagle Mountain, UT 84005   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work, in general, consists of the following: a) The Cured-in Place (CIPP) rehabilitation lining of approximately 15 pipe segments varying from 47.53 feet long to 520.90 feet long. The existing pipe is 30-inch reinforced concrete pipe in deteriorated condition. The work shall include but not be limited to all traffic control, bypass pumping, pipe cleaning and pre-lining video, lining, curing, post lining video, and site restoration necessary to complete the project in accordance with the plans and specifications. b) All work and material necessary to complete the work in accordance with the Contract Documents and in conformance with the Design Standards and Construction Specifications for Eagle Mountain City

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents