Similar Projects
Bingham Creek Regional Park Phase 2
Post-Bid
Salt Lake City, UT

Aqua Tots Swim Schools
Renovation - 5,600 SF
Post-Bid
Midvale, UT 84047

Oquirrh Hills Golf Course Pavilion
New Construction - 3,140 SF
Results
Tooele, UT 84074

Park Pavilion
Term Contract
Results
Less than $800,000 est. value
Murray, UT 84107

Park Concessions Building Project
New Construction, Demolition - 900 SF
Construction
West Bountiful, UT 84087

Viewmont High School Baseball Field Renovation
Construction
Bountiful, UT 84010

Nordic Valley Expansion
New Construction
Pending Verification
$6,500,000 est. value
Eden, UT

Construction Of New Baseball Dugouts
New Construction
Post-Bid
Tabiona, UT 84072

Steed Park Pickleball Design/Build
Results
Less than $350,000 est. value
Clearfield, UT 84015

Press Box Buildings and Coaches Offices at Hunter High School
Construction
West Valley City, UT 84120

Clyde Rec Center Pickleball Courts Project
Post-Bid
Springville, UT

2020 Park Improvements
Results
Draper, UT

RAC Shade Structure
Post-Bid
Salt Lake City, UT 84114

Dfcm Construction-Willard Bay State Park Day Use Pond Improvements-19074510
Results
Less than $375,000 est. value
Willard, UT

Homestead Park Pavilion
Renovation
Post-Bid
Riverton, UT 84065

Last Updated 03/13/2020 02:12 PM
Project Title

RBG Herb Garden Kitchen

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84108   (Salt Lake County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Red Butte Garden will be replacing our existing outdoor Demonstration Kitchen Island with an upgraded facility to better accommodate our educational courses. The existing kitchen island includes potable cold water, single basin sink, and a single electrical outlet. The upgrade to the new kitchen island will match existing CMU / sandstone masonry construction with custom engraved donor panel, expand upon the existing utilities by adding water heater, potable hot water, wall hydrant, floor sink, commercial faucet,double basin copper sink, expanded electrical outlets, multiple LP cooktop burners, under counter refrigerator, cabinetry frames, polymer door panels, hardware, soapstone countertop and support structure accommodating ADA guidelines.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 04 - Masonry, Unit Masonry Panels.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Painting and Coating.
Division 12 - Furnishings, Countertops.
Division 22 - Plumbing, Electric Domestic Water Heaters, Commercial Domestic Water Electric Booster Heaters, Commercial Storage Electric Domestic Water Heaters, Commercial Plumbing Fixtures, Commercial Lavatories and Sinks, Commercial Sinks.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 41 - Material Processing and Handling Equipment, Storage Equipment and Systems, Storage Cabinets.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents