Similar Projects
Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Design
Port Angeles, WA

San Souci Road Elevation Design
Infrastructure
Design
WA

Mount St. Helens Spirit Lake Intake Headwall
Alteration
Bidding
$10,000,000 to $20,000,000 est. value
Cougar, WA 98616

South Lake Stevens Road Intersection Improvements
Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Post-Bid
WA

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Improvement of Middle Waitsburg Road MP 6.10 To MP 7.92
Infrastructure
Results
Walla Walla, WA 99362

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

Miscellaneous COF Upgrades
Infrastructure
Bidding
$470,000 est. value
Moses Lake, WA

Eastrail North Segment Tie Removal and Interim Trail Phase 2
Infrastructure
Post-Bid
$1,280,212 est. value
Kirkland, Woodinville, WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

US 97A/SR 971, Rock Slope Scaling
Infrastructure
Bidding
WA

Douglas Truth Branch Library Access Improvements
Renovation, Infrastructure, Alteration - 18,848 SF
Post-Bid
$450,000 to $500,000 est. value
Seattle, WA 98122

Last Updated 11/26/2021 02:31 AM
Project Title

92nd Avenue East/224th Street East

Physical Address View project details and contacts
City, State (County) WA   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,700,000 to $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the improvement of the 92nd Avenue East/224th Street East intersection by installing a traffic signal system. 224th Street East will be widened to provide an eastbound left-turn lane as well as westbound left-turn and right-turn lanes at 92nd Avenue East. A two-way left-turn lane will also be provided west of 90th Avenue East and between 90th Avenue East and 92nd Avenue East. Other improvements along 224th Street East include paved shoulders, curb, gutter, sidewalk, enclosed drainage, illumination, signal interconnect, and other work in accordance with and as described in the Plans and Specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents