Similar Projects
270th Street NW Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Stanwood, WA 98292

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

County Forces Projects - Rivershore Road Flood Repair
Infrastructure
Design
$207,595 est. value
Clearview, WA 98290

Water Filter Plant Portal 4 Improvements Project
Renovation, Infrastructure
Bidding
$3,963,000 CJ est. value
Monroe, WA 98272

96th Avenue Infiltration
Infrastructure
Bidding
$389,000 CJ est. value
Edmonds, WA 98020

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Warm Beach Water System Water Replacement
Infrastructure
Post-Bid
$2,000,000 est. value
Stanwood, WA 98292

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Lord Hill Regional Park - Snohomish County
Term Contract
Pending Verification
$5,000,000 CJ est. value
Snohomish, WA 98290

SR 99/Lincoln Way Vic to Evergreen Way - ADA Compliance
Infrastructure
Design
$969,000 CJ est. value
Everett, WA 98208

Heritage Park & Church Creek Park Sports Courts
Infrastructure
Bidding
$200,000 CJ est. value
Stanwood, WA 98292

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Station 50 - Waterline Extension
Infrastructure
Results
Arlington, WA 98223

SR 526 Corridor Improvements
Infrastructure
Design
$39,197,000 CJ est. value
Everett, WA 98203

Last Updated 09/29/2022 12:33 PM
Project Title

Rainier Street Utility Improvements

Physical Address View project details and contacts
City, State (County) Snohomish, WA 98290   (Snohomish County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Snohomish is seeking a contractor to furnish all labor, materials, and equipment necessary to construct a new force main in the City of Snohomish as shown on the project plans and specified in the these technical provisions. The Work to be performed under this contract provides for constructing a new force main and other Work necessary to complete the project as shown on project plans and specified in these technical provisions for the City of Snohomish, Snohomish County, Washington. Project Title: CITY OF SNOHOMISH RAINIER STREET UTILITY IMPROVEMENTS Engineer's Estimate Range: $1,900,000 - $2,100,000. To access the project, click on "Posted Projects", "Public Works", "City of Snohomish", and "Projects Bidding". Note bidders are encouraged to "Register as a Bidder", in order to receive automatic email notifications of future addenda and to be placed on the "Bidders List". All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check or surety bond in an amount equal to of the grand total amount of such bid proposal. No bid shall be considered unless accompanied by such bid proposal deposit. If the successful bidder does not enter into a contract and file a performance and payment bond and the required insurance certificates, with the City of Snohomish within ten (10) working days after Notice of Award of Bid, the amount of the bid deposit shall be forfeited to the City of Snohomish. Unsuccessful bidders' deposits will be returned upon City's execution of contract documents or rejection of all bids. The bond must be delivered to the Snohomish City Clerk within ten (10) working days after notification of the award to the successful bidder. The Bond must be approved by City officials before the contract award is final. A Contract is required and must be executed and returned to the City of Snohomish within ten (10) working days after notification of award. Approval of the contract by City officials is required before the contract award is final. A certificate of liability insurance reflecting the required public works contract insurance limits for this project must be furnished to the City of Snohomish within ten (10) working days after Notice of Award of Bid. This insurance certificate shall also specifically name the City of Snohomish as an additional insured. The successful bidder may not commence work under this contract until all required insurance coverage has been approved by the City. The City of Snohomish reserves the right to reject any or all bids, and to waive irregularities or informalities in the bid or in the opening. The City of Snohomish reserves the right to delete portions of the work. No bidder may withdraw their bid after the hour set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding sixty (60) calendar days. The bidder further agrees to begin work within ten (10) working days after Notice to Proceed has been issued by the City of Snohomish. The Contractor has eighty (80) working days to complete the construction of the project. Payment of liquidated damages will be made by the Contractor to the City in the amount specified in the Contract if the construction work is not physically completed within the allotted working days, in accordance with Section 1-08.9 of the Standard Specifications. Bid package and technical related questions can be directed to Andrew Sics, Senior Utilities Engineer, at (360) 282-3174. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents