Similar Projects
Bee Creek Road Bridge Replacement
New Construction
Bidding
MO

Bridge Replacement, Grading and Pavement
New Construction, Infrastructure
Bidding
MO

11th Street over Corby Parkway Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO 64504

Clay County Bridge Replacement
New Construction
Post-Bid
Liberty, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Buckner Tarsney Road Bridge Replacement North of Ryan Road
Results
Independence, MO

Hubble Ford Bridge Replacement
New Construction, Infrastructure
Bidding
Jackson, MO

King Hill Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO

Highway N Bridge Repairs at Dardenne Creek Repairs
Results
Cottleville, MO

Bridge Repair and Sign Installation
New Construction, Infrastructure
Bidding
$250,000 to $500,000 est. value
MO

22nd Street Over Corby Parkway Bridge Replacement
New Construction, Infrastructure
Post-Bid
Saint Joseph, MO 64504

Washington County Bridge Replacement
Results
Potosi, MO

Bridge Redeck
New Construction, Infrastructure
Bidding
$7,500,000 to $1,000,000 est. value
MO

Gene Field Road over North East Parkway Bridge
New Construction
Post-Bid
Saint Joseph, MO 64504

2021 Bridge Deck Sealing
New Construction
Results
Wildwood, MO

Last Updated 11/20/2021 12:33 AM
Project Title

Bridge Rehabilitations

Physical Address View project details and contacts
City, State (County) MO   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $7,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Job J6P3308 Route 367 Saint LouisCounty. 9 Bridge Rehabilitations from Route 67 (Lindbergh) to I-270 and then at Maline Creek, the total length of improvement being 1.091 miles.****(2): Job J6S3437 Route 367 Saint Louis County. Resurface on Route 367 from North of I-270 to Halls Ferry Circle, the total length of improvement being 3.42 miles.

Details

Bridge, New Construction, Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents