Similar Projects
Multiple I-25 on - Ramps Between MM 148 and MM 158
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
CO

Black Forest Roadway Improvements - Woodmen Road to Research Parkway CM Services
Infrastructure
Bidding
Colorado Springs, CO 80902

Falcon Highlands Maintenance Project
Post-Bid
Colorado Springs, CO 80903

Pedestrian Bridge and Abutment Landing
Post-Bid
Colorado Springs, CO

2020 Pavement Resurfacing Project
Results
Fountain, CO 80817

Laying Asphalt Paving Material
Term Contract
Results
CO

Manitou Avenue Paving from El Paso to Ruxton
Post-Bid
Manitou Springs, CO 80829

CO FTBR Crystal Dam (1), East Portal Access Road
Results
$4,500,000 to $5,500,000 est. value
CO

Grinnell Boulevard and Fontaine Boulevard Intersection Improvements
Post-Bid
CO

Two-Inch Mill And Overlay Of On/Off Ramps At Four Interchanges In The Colorado Springs Area
Results
$1,000,000 to $5,000,000 est. value
CO

2C Extension Pre-Overlay Concrete
Post-Bid
Colorado Springs, CO 80903

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

2C Extension Asphalt Overlay
Post-Bid
Colorado Springs, CO

Pikes Peak Greenway Trail Improvements - I25 To Cottonwood
Results
Colorado Springs, CO

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Reported 10/15/2021 12:00 AM
Project Title

I-25 Ramps South Nevada Avenue/South Tejon Street Corridor Improvements Project

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80902   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $8,660,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intersections of the I-25 ramps and S Nevada Ave and S Tejon St typically experience reoccurring traffic incidents, conflicts, and congestion during peak weekday and weekend travel times. The City and CDOT have studied and implemented improvements in the S. Nevada and S. Tejon corridors over the course of time. This project is the latest effort in improving efficiency and safety for all modes of traffic based upon today’s current conditions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents