Similar Projects
Pilgrim High School Replacement - Warwick Public Schools
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Warwick, RI 02888

Toll Gate High School Replacement - Warwick Public Schools
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Warwick, RI 02886

Division Road Residences
New Construction, Infrastructure
Design
$158,000,000 CJ est. value
East Greenwich, RI 02818

Hallene Road Distribution Facility
New Construction, Infrastructure - 541,000 SF
Design
$58,400,000 CJ est. value
Warwick, RI 02886

City Hall Plaza Site Improvements
Infrastructure
Bidding
$923,000 CJ est. value
Warwick, RI 02886

Street Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Warwick, RI 02889

Providence Street (WW) Wall Repairs
Infrastructure, Renovation
Post-Bid
$2,000,000 CJ est. value
West Warwick, RI 02893

Providence Street (WW) Wall Repairs
Infrastructure, Renovation
Post-Bid
$2,000,000 CJ est. value
West Warwick, RI 02893

Southside Site Work and Grading
Infrastructure
Results
$3,918,816 CJ est. value
Warwick, RI 02886

Cedar Swamp Force Main Rehabilitation
Infrastructure
Results
$13,935,935 CJ est. value
Warwick, RI 02889

Russel Speeder's Car Wash
New Construction, Infrastructure - 4,739 SF
Construction
$1,000,000 CJ est. value
East Greenwich, RI 02818

Russel Speeder's Car Wash
New Construction, Infrastructure - 4,739 SF
Construction
$1,000,000 CJ est. value
East Greenwich, RI 02818

Post Road Contractor Storage Building
New Construction, Infrastructure
Pending Verification
$7,600,000 CJ est. value
Warwick, RI 02888

Post Road Contractor Storage Building
New Construction, Infrastructure
Pending Verification
$7,600,000 CJ est. value
Warwick, RI 02888

Gravity Thickner #1, #2 & Odor Control Rehabilation - City of Warwick
Infrastructure
Conception
$725,000 CJ est. value
Warwick, RI 02889

Last Updated 02/14/2024 03:47 PM
Project Title

Woodsprings Suites - Post Road / Warwick

Physical Address View project details and contacts
City, State (County) Warwick, RI 02886   (Kent County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $30,400,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This project is now out to bid.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents