Similar Projects
College Road Bus Pullouts
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Fairbanks, AK 99790

Married Man's Trail Improvements
Infrastructure
Bidding
$325,000 to $400,000 est. value
Ketchikan, AK 99901

Mountain View Pavement Rehabilitation
Infrastructure, Alteration
Post-Bid
$1,000,001 to $3,000,000 est. value
Anchorage, AK 99529

Construct, Maintain, and Decommission Community Winter Access Trails From Existing Gravel Road Infrastructure
Infrastructure
Post-Bid
AK

Washburn Street Area Reclamation
Infrastructure
Results
$500,001 to $1,000,000 est. value
Anchorage, AK 99502

Anchorage Golf Course Sidewalk Repairs
Infrastructure
Results
Anchorage, AK 99507

Knik-goose Bay Rd Reconst, Phase 1 - Fairview Loop to Centaur Avenue
Infrastructure
Bidding
$40,000,000 to $50,000,000 est. value
Wasilla, AK 99654

Parking Lot Maintenance
Infrastructure
Post-Bid
Palmer, AK 99645

Anchorage Golf Course Cart Path Repairs
Infrastructure
Results
$1 to $100,000 est. value
Anchorage, AK 99507

Hoonah Harbor Way Pedestrian Improvements and Pitt Island Cemetery Walkway
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
Hoonah, AK

Felton Street Extension
Infrastructure
Post-Bid
$300,000 est. value
Palmer, AK 99645

Improve Lighting on Three Corridors in Anchorage Ranked Highest for Pedestrian Crashes in Alaska
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
AK

2022 William B Lyons Park Improvements
Renovation, Infrastructure
Post-Bid
$500,000 est. value
Anchorage, AK

Sitka Sawmill Creek Road Resurface and Pedestrian Improvements
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
AK

Fast Area Surface Upgrades FFY2022
Renovation, Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Fairbanks, North Pole, AK

Last Updated 05/18/2022 02:55 AM
Project Title

Main Street Sidewalk Improvement Project

Physical Address View project details and contacts
City, State (County) Homer, AK 99603   (Kenai Peninsula County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all labor, materials, equipment, tools, supervision, and other facilities necessary to perform the project in accordance with the plans and specifications. The work includes, but is not limited to the following: Furnish materials for and install approximately 2,900 feet of asphalt sidewalk along the west side of Main Street, from Pioneer Avenue to Dehel Avenue. This will also involve 2,130 CY of excavation, removal of obstacles as specified in the plans, installation of curb and gutter, installation of varying sizes of CSP culvert sections, reconstruction of driveways, approaches and existing manholes and inlets, construction of new storm sewer manholes, topsoil installation and seeding.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Exploratory Excavations.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Culverts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents