Similar Projects
Hemphill Creek 12-inch, 24-inch, 27-inch Wastewater Main - 564 - City of San Marcos
Infrastructure
Conception
$8,400,000 CJ est. value
San Marcos, TX 78666

Harris Hill Road Water Line - 660 - City of San Marcos
Infrastructure
Conception
$2,350,000 CJ est. value
San Marcos, TX 78666

Luxe of Buda
New Construction, Infrastructure - 7,066 SF
Design
$750,000 CJ est. value
Buda, TX 78610

Process Utility Phase 2 for Simwon America Corporation
Renovation - 491,651 SF
Design
$2,000,000 est. value
Kyle, TX 78640

RFQ/P Construction Manager-At-Risk - STEM Classroom Building for Texas State University
New Construction, Infrastructure - 155,900 SF
Bidding
$100,200,000 CJ est. value
San Marcos, TX 78666

Loop 82 and Bobcat Stadium
Infrastructure
Post-Bid
$68,931 CJ est. value
San Marcos, TX 78666

RFQ Engineering - Parks and Recreation Architectural and Engineering Design Services Garison Park
Infrastructure, Renovation
Post-Bid
$500,000 CJ est. value
Buda, TX 78610

Brush Square - Phase 1 Implementation
Infrastructure
Results
$2,200,000 est. value
Austin, TX

Stephenville Metal Building
New Construction, Infrastructure
Results
$37,146 CJ est. value
Austin, TX 78701

Capitol Complex, Phase 2
New Construction, Infrastructure
Construction
$225,000,000 CJ est. value
Austin, TX 78701

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

Engineering Discovery Building - CMAR
New Construction, Infrastructure
Pending Verification
$169,650,000 CJ est. value
Austin, TX 78712

Montage
New Construction, Infrastructure - 310,661 SF
Pending Verification
$66,500,000 CJ est. value
Austin, TX 78704

Gary Job Corp Lift Station (LS #46) Decommissioning and Water Main Extension - 575 - City of San Marcos
Renovation, Infrastructure
Conception
$7,800,000 CJ est. value
San Marcos, TX 78666

Just A Closet Storage #12 / San Marcos
New Construction, Infrastructure - 157,290 SF
Design
$20,000,000 CJ est. value
San Marcos, TX 78666

Last Updated 04/10/2023 12:10 PM
Project Title

Bobcat Buda

Physical Address View project details and contacts
City, State (County) Buda, TX 78610   (Hays County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 10, 2023 the project is in permitting. A firm construction timeline has yet to be released.

Details

11,324 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents