Similar Projects
Anzalduas Bridge Infrastructure Improvements
Renovation, Infrastructure
Bidding
$81,234,287 est. value
McAllen, TX 78505

SH 146 - Construct Bridge
New Construction, Infrastructure
Bidding
$18,515,029 est. value
Baytown, TX 77523

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Galveston County Road and Bridge Facility Rebuild
Results
Dickinson, TX 77539

FM 365 - Bridge Replacement
New Construction
Results
$1,529,535 est. value
TX

SL 301 - Bridge Replacement
Renovation, Infrastructure
Bidding
$1,394,680 est. value
Dike, TX

Clear Span Concrete Bridge - 20, 30, 40 and 50 Foot and Concrete Box Culverts
Term Contract
Post-Bid
TX

RM 1321 - Bridge Replacement
New Construction
Results
$3,535,838 est. value
TX

Peek Road Bridge Repairs Over Willow Fork of Buffalo Bayou
Renovation, Infrastructure
Post-Bid
TX

FM 562 - Bridge Replacement
New Construction, Infrastructure
Results
$1,657,374 est. value
TX

IH 45 - Replace SB Frontage Road Bridge and Approaches
New Construction, Infrastructure
Results
$6,006,750 est. value
TX

US0059 - Bridge Preventative Maintenance
New Construction, Infrastructure
Results
$408,116 est. value
TX

US 69 - Bridge Maintenance
New Construction, Infrastructure
Results
$3,706,687 est. value
TX

VA - Bridge Maintenance
Renovation, Infrastructure
Results
$509,470 est. value
TX

Reported 06/25/2022 12:00 AM
Project Title

Renner Road Bridge Over Prairie Creek

Physical Address View project details and contacts
City, State (County) Richardson, TX 75082   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $399,100 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The demolition of bridge approach slab, bridge deck, armor joint, abutment backwalls and wingwalls, approach and bridge rail parapet and pilasters, and riprap, per plans and specs. Stone cladding, caps, and lighting components will be removed and salvaged. Reconstruction includes bridge abutment backwalls, wingwalls, deck, approachslab, new armor joints, approach and bridge rail parapet and pilasters, salvaged stone cladding reinstallation with new stone as needed, crack and spall repair per TxDOT procedures, traffic control during construction, and all incidentals necessary to compete the project.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents