Last Updated | 03/08/2023 09:56 AM |
Project Title | 2022 - Elm Drive Stormwater Improvement Project - Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Hillsboro, MO 63050 (Jefferson County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $1,772,126 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of March 8, 2023, this project has been cancelled. No definite date for the rebid. The proposed work includes: Adding closed drainage along Elm Drive from Ron De Lee Drive to 400' East of Red Diamond Drive, Adding various curb inlets, area inlets, and manholes, the addition of new concrete curb and gutters with new driveway approach pavement, a rock reinforced slope, guardrail, fencing, An Ultrathin bonded wearing surface from Miller Road to West Outer Road along with striping. The total project length is 4,691'. Work shall be in accordance with the provided Specifications, Job Special Provisions, and Plans. Where not specifically covered by the Specifications, or Job Special Provisions or Plans, the Contractor shall adhere to the currently effective 2022 Edition of the "Missouri Standard Specifications for Highway Construction", and the currently effective "MoDOT Standard Plans for Highway Construction." The contractor shall have a maximum of complete the project. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work, of a similar character in this locality, as established by the State of Missouri's Annual Wage Order that is currently in effect at least 10 calendar days prior to bid opening. Jefferson County, Missouri hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2022 Edition. The contractor questionnaire must be on file 7 days prior to bid opening. Contractors and sub-contractors who sign a contract to work on any public works project must provide a minimum 10- Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A cashier's check or bid bond in the amount of 5% shall be submitted with each proposal. A certificate of insurance shall be submitted with each proposal. All bids shall be made on the forms provided. Three (3) copies of the bid must be submitted, one (1) being original inked. Jefferson County, Missouri reserves the right to reject any or all bids, to waive any informality in the bids received, and to award the contract to the lowest, responsive, responsible bidder. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |