Similar Projects
Pedestrian Bridge over Autauga Creek
New Construction, Infrastructure
Bidding
$450,000 to $500,000 est. value
Prattville, AL 36067

Pedestrian Bridge Over Water Street, Bin 17197 Repair and Repainting
Post-Bid
Mobile, AL

Sunset Road - Bridge Replacement (Structure 215)
Post-Bid
Mobile, AL

Constructing the Bridge Deck Repair (Hydroblasting and Deck Rehabilitation)
Results
$338,495 to $413,716 est. value
AL

Glasgow Road Bridge Replacement in Jefferson County
Results
Less than $1,381,429 est. value
Birmingham, AL 35203

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Albright Road Bridge Replacement Project
Results
Less than $688,000 est. value
Tuscaloosa, AL 35403

Aerial Bridge Crossing Project
New Construction, Infrastructure
Post-Bid
Huntsville, AL

Constructing the Bridge Replacement and Approaches on Cr-19 (Ball Play Road) Over Mill Creek Northwest of Piedmont
Results
$828,502 to $1,015,614 est. value
AL

Brewton Bridge Trail Restoration
Renovation
Post-Bid
Brewton, AL

Constructing the Concrete Rehabilitation, Shoulder Reconstruction, Bridge Rail Retrofit, and Ramp Improvements on I-59 from a Point South of the Junction of CR-10 in Trussville (MP 140.002) to a Point
Results
$12,603,725 to $15,404,553 est. value

Bridge Replacement on CR-217 Over Saugahatchee Creek
Renovation, Infrastructure
Post-Bid
$1,256,029 to $1,604,926 est. value
AL

Old Highway 20 Phase III-A Bridge over Norfolk-Southern Railroad
Results
Huntsville, AL 35801

Constructing the Bridge Widening and Approaches (Grading, Drainage, and Traffic Stripe) on SR-304 (Old CR-24) Over I-65 in Tanner
Results
$2,797,202 to $3,418,803 est. value
AL

Constructing the Bridge Replacement on SR-163 Over Perch Creek from MP 3.931 to MP 3.983
Results
$3,114,592 to $3,806,724 est. value
AL

Reported 12/27/2021 11:30 AM
Project Title

Walker Chapel Road Bridge Replacement

Physical Address View project details and contacts
City, State (County) Fultondale, AL 35068   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removing the existing steel bridge and replacing it with a pre-stressed concrete girder bridge.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents