Similar Projects
Charleston-Capers Island Dock Replacement
Infrastructure
Bidding
$170,000 to $210,000 est. value
SC

Folly Beach DPS Marine Launch Dock
Infrastructure
Bidding
Folly Beach, SC

Battery Pringle Revetment Renovation Project. The Dill Property
Renovation
Post-Bid
James Island, SC

Surfside Beach Fishing Pier Reconstruction Project
Post-Bid
Less than $13,400,000 est. value
Surfside Beach, SC 29575

Belton Kayak Launch
Results
$1 to $1,000,000 est. value
Belton, SC 29627

Surfside Beach Fishing Pier Restoration Project
Results
Surfside Beach, SC 29575

Steamboat Landing Bulkhead Replacement Project
Infrastructure
Bidding
Edisto Island, SC 29438

Charleston - Santee Coastal Reserve Dock Replacement
Post-Bid
$250,000 to $350,000 est. value
McClellanville, SC 29458

Marina Dock Rehabilitation
Results
Isle of Palms, SC 29451

H.E. Trask Boat Landing Repairs
Infrastructure
Bidding
Beaufort, Bluffton, SC 29910

State Park Piers Repair - Hunting Island
Post-Bid
$750,000 to $1,000,000 est. value
Saint Helena Island, SC 29920

Marine Contractors for the Construction of the Battery Park Pedestrian Bridge
Results
North Charleston, SC 29406

Furnish and Install A Dock at Pack's Landing
Post-Bid
Rimini, SC

State Park Piers Repair - Edisto Beach
Results
$515,000 to $775,000 est. value
Edisto Island, SC 29438

Underwater Piling Installation
Post-Bid
$25,000 to $100,000 est. value
Eastover, SC

Last Updated 12/17/2021 11:00 AM
Project Title

Whitehall Boardwalk Project

Physical Address View project details and contacts
City, State (County) Beaufort, SC   (Beaufort County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $473,592
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Whitehall Drive Boardwalk is an approximately 280' boardwalk connecting US 21 to abandoned White Hall Drive roadbed over a tributary of the Beaufort River. The plan is to construct a multi-use 12' wide timber boardwalk along the Whitehall Park Trail to connect to Sea Island Parkway, US21. The site connects the two roadway embankments consisting of grassy landscaped areas Specifically, the boardwalk will provide a direct connection from existing bicycle-pedestrian facilities to Whitehall Park. The project is for public transportation of pedestrians and bicycles. The work consists of constructing a wooden multi-use 12’ wide boardwalk along the Whitehall Park Trail to the Sea Island Parkway. Work shall include Earthwork, Removal & Disposal of existing Sidewalk, expanding the Sidewalk with an Inline Pedestrian Ramp and installing a Variable Width Boardwalk adjacent to the sidewalk which will tie into the elevated boardwalk construction. The boardwalk will be approximately 280 feet long with 10-inch diameter wooden piles spaced at 10-foot increments.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents