Similar Projects
Last Updated | 05/02/2022 04:22 AM |
Project Title | Landscaping Replacement |
Physical Address | View project details and contacts |
City, State (County) | Millbury, MA 01527 (Worcester County) |
Category(s) | Single Trades |
Sub-Category(s) | Landscaping/Irrigation |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Landscaping Replacement at the Upper Blackstone Clean Water facility, 50 Route 20, Millbury, MA 01527. Scope: Remove existing landscaping on the steep hillside behind the Administration Building and replace with new soil and hydroseed wildflower mix at the Upper Blackstone Clean Water facility. The existing landscaping to be removed is on a steep hillside and includes hedges, crushed stone and scrubby brush. Remove material to approximately 6” below grade and dispose of excess material offsite. Near the base of the hill, an approximately four-foot wide row of 6” +/- riprap shall be installed. The wildflower hydroseed mix shall be suitable for the location intended. Total area of project is approximately 8,200 sf, photo attached below. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |