Similar Projects
Mowing & Grounds Maintenance Services, Birch Hill Dam & Tully Lake Dam, Royalston, MA
Term Contract
Design
Royalston, MA 01368

Grounds Maintenance Services, Westville Lake, Southbridge MA
Term Contract
Design
Southbridge, MA

Maintenance of Recreational Properties Mowing and Snow Removal Service
Post-Bid
Charlton, MA

Town Wide Mulch Installation
Post-Bid
Northborough, MA

Fort Devens National Cemetary, Devens, MA 01432 | Grounds Maintenance Services
Results
Devens, MA 01434

Tree Planting Academy Hill Road
Results
$14,847 est. value
Westminster, MA 01473

Grounds Maintenance Services, Buffumville Lake, Charlton, MA and Hodges Village Dam, Oxford, MA
Term Contract
Design
Charlton, Oxford, MA 01507

Care of Cemeteries
Post-Bid
Less than $20,000 est. value
Petersham, MA

Tree Removal and Tree Trimming Services
Term Contract
Results
$177,150 est. value
Fitchburg, MA

Survey & Aquatic Herbicide Treatment, East Brimfield Dam, Fiskdale, MA
Term Contract
Design
Fiskdale, MA

Town-Wide Mulch Installation
Post-Bid
Northborough, MA

Ground Maintenance
Alteration
Results
Westborough, MA

Forestry Management Services 2021-2031
Post-Bid
Leominster, MA

Mowing of Stump-Sprouted Trees and Pole Size Single Trees at the Birch Hill Wildlife Management Area
Alteration
Results
$23,000 est. value
Winchendon, MA

Treatment of Nuisance Vegetation
Post-Bid
Auburn, MA

Last Updated 05/02/2022 04:22 AM
Project Title

Landscaping Replacement

Physical Address View project details and contacts
City, State (County) Millbury, MA 01527   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Landscaping Replacement at the Upper Blackstone Clean Water facility, 50 Route 20, Millbury, MA 01527. Scope: Remove existing landscaping on the steep hillside behind the Administration Building and replace with new soil and hydroseed wildflower mix at the Upper Blackstone Clean Water facility. The existing landscaping to be removed is on a steep hillside and includes hedges, crushed stone and scrubby brush. Remove material to approximately 6” below grade and dispose of excess material offsite. Near the base of the hill, an approximately four-foot wide row of 6” +/- riprap shall be installed. The wildflower hydroseed mix shall be suitable for the location intended. Total area of project is approximately 8,200 sf, photo attached below.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents