Similar Projects
Lane Avenue Shared Use Path Project - State Of Ohio
Infrastructure
Conception
$338,000 est. value
Columbus, OH 43227

Alum Creek and Olentangy Trail Connector - State of Ohio
Infrastructure
Conception
Columbus, OH 43231

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Well Now Shell
New Construction, Demolition, Infrastructure - 4,115 SF
Design
$2,000,000 est. value
Columbus, OH 43207

FRA-62-30.16 US62 and SR161 Roadway Improvements
Infrastructure
Bidding
$8,080,000 est. value
New Albany, OH 43054

US 40 - Intersection
Infrastructure
Bidding
$1,090,006 est. value
Columbus, OH

Street Resurfacing and Sewer System Improvements
Post-Bid
Valleyview, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Major Reconstruction - IR-IR 71-17.46 (Proj 3B)
Results
Columbus, OH 43004

UIRF 2016 Sidewalks P2
Results
Less than $1,707,075 est. value
Columbus, OH

Crack Sealing
Infrastructure
Bidding
$711,862 est. value
Wintersville, OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Grandview Heights Signals Interconnect
Results
Less than $1,156,318 est. value
Grandview Heights, OH 43212

Crack Sealing
Infrastructure
Bidding
$259,729 est. value
Columbus, OH

Improvement of 50 East Mound Street
Infrastructure
Post-Bid
$691,457 est. value
Columbus, OH 43215

Last Updated 06/27/2022 07:01 AM
Project Title

Groveport Municipal Golf Course Cart Path Replacement Project

Physical Address View project details and contacts
City, State (County) Groveport, OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,540,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mill and overlay of various alleys and streets requiring the placement of approximately 480 c.y. of asphalt pavement, crack sealing, pavement markings, approximately 2,270 s.f. of concrete and brick sidewalk replacement, approximately 70 s.y. of pavement repairs along with other miscellaneous work. Removal and replacement of the majority of the asphalt cart path network on the City's municipal golf course. The work will require approximately 4,200 c.y. of excavation of existing path material, placement of approximately 2,800 c.y. of aggregate base, and approximately 1,320 c.y. of asphalt material along with all necessary restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents