Similar Projects
The Mapop Hotel
New Construction, Renovation
Conception
Richmond, VA 23224

Brambleton Avenue Redevelopment
New Construction, Renovation - 173,000 SF
Conception
Norfolk, VA

Woods of King's Creek - Phase I
New Construction
Design
Williamsburg, VA 23185

Liberty View Mixed Use Development
New Construction - 891,675 SF
Design
Springfield, VA

Goolrick Hall Swimming Pool Maintenance
Term Contract
Bidding
Fredericksburg, VA

Swimming Pool Maintenance and Repairs
Bidding
Woodbridge, VA

Swimming Pool Operations and Maintenance Services
Term Contract
Post-Bid
Alexandria, VA 22314

Pool Renovations
Post-Bid
Grottoes, VA 24441

Swimex 700T Physical Therapy Pool Maintenance
Results
Portsmouth, VA 23708

Pool Resurfacing at Chickahominy Riverfront Park
Results
VA

Meadow Branch
New Construction - 6,800 SF
Construction
$20,338,800 est. value
Winchester, VA 22601

Carter's Mill
New Construction
Construction
Haymarket, VA

Riviera at Semmes
New Construction
Pending Verification
$25,000,000 est. value
Richmond, VA

Presidio Apartments
New Construction, Build-Out
Pending Verification
Charlottesville, VA

Pumunkey Tribe Casino
New Construction
Design
$350,000,000 est. value
Richmond, VA

Reported 05/31/2019 12:00 AM
Project Title

Memorial Pool Repair

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA 23451   (Virginia Beach City County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000 to $25,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Camp Pendleton State Military Reservation: Memorial Pool Repair - The work includes the removal of the existing surfaces in and around the pool basin, drains and pipes. - Grout Repair: Exterior grout removal and re-installation, Include the following: - Grind/cut out all existing grout under exterior of existing coping stones. Installation of new grout in those areas. - Resurface using Eco-Friendly Thermoplastic polymeric coating finish - Coating must be chemical, stain, crack and scale resistant. - Product must comply with NSF/ANSI 61 Standards - Install new VGB Drain Covers - Install new upgrade pool equipment complete with wireless autofill - Install multi-colored LED lighting in upper and lower basins.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents