Similar Projects
Bell Roth Park Irrigation Pumphouse Remodel
Infrastructure
Bidding
Federal Heights, CO 80260

SACWSD Interconnect Design and Construction
Infrastructure
Bidding
Brighton, CO

J099--Evoqua Water System testing and Maintenance Services for SPS RMRVAMC - 554
Post-Bid
Aurora, CO

Repair of 12 Inch Waterline - Piney creek Crossing at Saddle Rock Golf Course
Post-Bid
$380,000 est. value
Aurora, CO 80016

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

2020 Water System Improvement Project
Results
$2,350,000 to $2,550,000 est. value
Aurora, CO 80012

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

Construction of A Water Line Relocation
Infrastructure
Bidding
Aurora, CO

2022 Water System Improvement
Post-Bid
Aurora, CO

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Thornton Water Project - Pipe Purchase
Infrastructure
Bidding
Thornton, CO

2022 PRV Vault Improvement
Post-Bid
Aurora, CO

Well A-15 Rehabilitation Project
Results
Less than $141,750 est. value
Aurora, CO 80016

Reunion Village 8 Filing 1 District Improvements
Infrastructure
Bidding
Commerce City, CO

Advance Metering Infrastructure (AMI) System
Post-Bid
Thornton, CO

Last Updated 12/09/2021 04:10 AM
Project Title

Twin Lakes Aeration

Physical Address View project details and contacts
City, State (County) CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design, procure and install an aeration system for the large pond at Twin Lakes Park as specified herein from a source(s) of supply that will give prompt and efficient service to the County. The Turnkey Scope of Work shall include, but may not be limited to the following: • Confirm size, depth and volume of the lake • All scientific analysis, engineering and construction services to properly design, size and install the aeration system such as: o Controllers, timers, flow meters, pumps, gauges and related infrastructure o Water pumps and manifolds o Lakebed tubing o Built-in redundancy measures to ensure continual operation of system o Optional services for ozone enhancements and beneficial bacteria injection • Plumbing system sizing and installation services for water source, piping, conduit and other required infrastructure, etc. • Electrical system sizing and installation services for power establishment, metering, and panels, etc. • Equipment shelter to protect infrastructure • Other services and equipment as needed to satisfy the scope of work. Contractor shall identify and provide this information to Adams County • Identify and obtain all required permits along with utility coordination • Training of Adams County personnel on the operation and maintenance of the system

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 46 - Water and Wastewater Equipment, Residuals Stabilization, Aerobic Digester Aeration Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents