Similar Projects
RFP Engineering - Jennings Lodge Elementary School Neighborhood Park Improvements
Infrastructure
Conception
$2,500,000 CJ est. value
Milwaukie, OR 97267

UO Retainer Program - Consulting Services - Extended Period
Renovation, Term Contract
Bidding

RFP Engineering - West Side Level B Reservoir and 24" Transmission Main
Infrastructure
Bidding
$100,000 CJ est. value
Wilsonville, OR 97070

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Eagle Creek Road/Duus Road Intersection Improvements
Infrastructure
Results
Oregon City, OR

RFQ Design - Architect and Engineering Services Preliminary Design of West Linn Public Works Operation Facility
Renovation
Bidding
$1,400,000 CJ est. value
West Linn, OR 97068

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

Damascus Area Safety Countermeasures Project
Term Contract, Alteration
Results
$304,223 est. value
Oregon City, OR

RFP - Stormwater Master Plan Update
Infrastructure
Bidding
$125,000 CJ est. value
Molalla, OR 97038

On-Call Pavement Evaluation and Design Services
New Construction, Infrastructure
Post-Bid
Milwaukie, OR

Architectural and Engineering and Related Services
New Construction, Infrastructure
Results
$600,000 to $800,000 est. value
Jennings Lodge, Portland, Troutdale, OR 97060

RFQ Engineering - 2023 Stormwater System Plan
Infrastructure
Bidding
$1,000,000 CJ est. value
Milwaukie, OR 97222

On-Call Geotechnical Engineering Services
Infrastructure
Post-Bid
Oregon City, OR

Last Updated 04/17/2023 08:27 AM
Project Title

RFP Engineering - Engineering Services for the Tri-City WRRF Influent Pump Station Expansion Project

Physical Address View project details and contacts
City, State (County) Oregon City, OR 97045   (Clackamas County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clackamas County Water Environment Services ("WES"), referred to as "District", is seeking Proposals for a vendor to provide engineering services for design, bidding, and engineering services during construction for the Tri-City Wastewater Resource Recovery Facility ("WRRF") Influent Pump Station Expansion Project. Proposers should demonstrate their firm's capabilities to successfully complete this project within the allowed budget and schedule. Selection will be made based on firm qualifications. An agreement will be developed with the selected firm. The District anticipates construction to begin in 2023 with the goal of having the new facilities operational by 2025. The capital budget for the project includes WES management, legal and administration costs, engineering design and construction services and construction and was estimated at $4,500,000 (2021 dollars). Deadline to Submit Clarifying Questions - September 8, 2022, 5:00 PM, Pacific Time - Procurement Process and Technical Questions: Tralee Whitley at TWhitley@clackamas.us Deadline to Submit Protest of Award - Seven (7) days from the Intent to Award Anticipated Contract Start Date - October 2022 The resulting contract from this RFP require the consultant to begin work in October 2022 with design set to continue through Winter of 2023. Construction of the project is anticipated to follow with associated services during construction. The Board of County Commissioners reserves the right to reject any and all Proposals not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any and all Proposals upon the finding that it is in the public interest to do so and to waive any and all informalities in the public interest. In the award of the contract, the Board of County Commissioners will consider the element of time, will accept the Proposal or Proposals which in their estimation will best serve the interests of Clackamas County and will reserve the right to award the contract to the contractor whose Proposal shall be best for the public good. Clackamas County encourages proposals from Minority, Women, and Emerging Small Businesses.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents