Similar Projects
Regional Wastewater Secondary Clarifier Addition
Results
Cedar City, UT

Wastewater Treatment Plant 2.4 MGD Expansion
Post-Bid
Salt Lake City, UT 84005

Mixing System Equipment for the Provo WATRR Center Phase 1 Project
Post-Bid
$90,000,000 est. value
Provo, UT 84601

Fine Screen Equipment for the Provo WATRR Center Phase 1 Project
Post-Bid
Provo, UT 84601

Purchase of Headworks Biofilter Engineered Media
Post-Bid
Syracuse, UT 84075

2 Blowers for the Headworks Biofilter
Post-Bid
Syracuse, UT 84075

2020 Wastewater Improvements
Results
Less than $310,000 est. value
Manti, UT 84642

Dryer Product Piping Replacement
Post-Bid
West Jordan, UT 84084

2021 Yard Piping Improvements Bioreactors
Results
Less than $100,000 est. value
West Jordan, UT 84084

Wastewater Treatment Plant 2020 General Upgrades
Results
Springville, UT

New Water Reclamation Facility
Post-Bid
Less than $80,000,000 est. value
Spanish Fork, UT

Final Effluent Pipeline Project
Bidding
Syracuse, UT

Plant Influent Bypass Pumping, Piping, and Operations
Renovation
Post-Bid
Syracuse, UT 84075

Equipment for Toole Water Reclamation Facility Filter Upgrade and Expansion
Renovation
Bidding
Erda, Tooele, UT 84074

Reported 04/23/2020 12:00 AM
Project Title

2020 Wastewater Treatment Capital Improvements

Physical Address View project details and contacts
City, State (County) Garland, UT 84312   (Box Elder County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing a 0.45 MGD wastewater treatment facility and includes the following work: Construction of a headworks building, an operations building, an Aero-Mod SEQUOX^ Process treatment system, site work, influent pump station, wastewater piping and connecting structures, site work, electrical, plumbing, heating and air conditioning, site utilities, automation and controls, and miscellaneous structures. The Owner has pre-selected the large equipment components. The project requires installation and connection of grit screening, grit removal equipment, odor removal equipment, Aero-Mod SEQUOX^ process, sludge dewatering equipment, ultraviolet disinfection equipment, and reaeration equipment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents