Similar Projects
(CBE) Lab Renovation
Renovation - 24,000 SF
Design
Madison, WI 53715

Kohl Center Addition and Renovation - GPC
Renovation, Addition - 96,500 SF
Bidding
$37,000,000 est. value
Madison, WI

WIMR-Loading Dock and Primate Center Renovation -GPC
Renovation - 10,851 SF
Bidding
$3,800,000 est. value
Madison, WI 53705

Negative Pressure Environmental Enclosure(Uw-Mad)[21-0033]
Addition
Post-Bid
Madison, WI

Early Learning Campus Remodel for Entrepreneurial Center
Renovation
Post-Bid
Madison, WI 53704

UW Research Lab Room 5018
Renovation
Results
Less than $171,000 est. value
Madison, WI 53705

Chemistry 2nd Floor Wang Lab Renovation
Renovation
Results
Less than $1,010,000 est. value
Madison, WI 53706

Truax Campus Civil, Interior Design, Architecture Remodel
Renovation
Construction
Madison, WI 53704

UWHC A7/B6-2 Infection Disease & Pulmonary Services Lab
Renovation
Post-Bid
Madison, WI 53792

Agricultural Dean's Residence Remodel
Renovation
Results
Less than $335,000 est. value
Madison, WI 53706

UWHC John Wall Dr Warehouse Build-out
New Construction
Post-Bid
Madison, WI 53704

New CDIS Building A/E Qualifications
New Construction, Addition
Results
$150,000,000 est. value
Madison, WI 53715

Kohl Center Addition and Renovation - MEP
Renovation, Addition - 96,500 SF
Post-Bid
$37,000,000 est. value
Madison, WI

Heating Plant Battery Room Improvements
Renovation
Results
Less than $70,000 est. value
Madison, WI 53704

RFB 21-016 TX-Information Technology
Renovation
Post-Bid
Madison, WI 53704

Last Updated 11/03/2021 10:32 AM
Project Title

Memorial Union Addition and Repairs- General

Physical Address View project details and contacts
City, State (County) Madison, WI 53703   (Dane County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of: 5th floor Addition: This addition will add approximately 2,000 GSF to the 5th floor of the Memorial Union for the Wisconsin Union Directorate’s Office. The project will contain three private offices adjacent to a 10-person open office space, and one conference room. New mechanical, electrical, plumbing, and fire protection will need to be brought into the space. The current penthouse exhaust will have to be modified to accommodate the addition. The structure will also need to be verified and possibly enhanced to accommodate the load of the addition. Construction timing will be discussed throughout the design to meet the needs of the Wisconsin Union and limit interruptions to events in adjacent spaces, including the reception room below the proposed addition. Theater and Tripp Commons Roof Deck Repair: The scope of this work includes repairing the roughly 7,000 GSF exterior theater deck and roughly 10,000 GSF Tripp deck to address code, leak, and egress issues. On the Tripp deck, tent anchors will need to be designed to withstand the structure of the three existing Union tents, currently used for events. The east Tripp deck egress stair will be modified from the current interior stair configuration to an exterior stair. This would require removing the glass vestibule on the east and modifying the interior stair condition on the first and second floors. Additional lighting is desired along the exterior perimeter of Tripp Commons and along the railing. Existing banner poles will be rehabilitated and reinstalled. Construction for this work will need to be thoroughly coordinated to address events in adjacent spaces, including the Terrace, and the recently completed Alumni Park. Refer to the Construction Logistics and Phasing plan for scheduling and phasing information. Terrace Material Lift Addition: The design and construction of a terrace material lift at the Memorial Union will replace the existing nonfunctional scissor lift and address issues related to moving staff with trash and eventequipment from the loading dock to the Terrace. The lift construction will need to be done in a way to preserveviews across the Terrace above as best as possible. Lift design will need to follow UW guidelines as well a construction codes. Work will need to occur within a specified time period, so as not to interfere with building operations and future planned events.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents