Similar Projects
2020 Street, Drainage, Water and Sewer Improvements
Post-Bid
$630,000 to $730,000 est. value
Dunn, NC 28334

30 Market St. Sewer Relocation
Post-Bid
$340,000 est. value
Concord, NC

South Main Street and Southern Avenue Stormwater Improvements
Results
$893,000 est. value
Raeford, NC 28361

2020 Annual Needs Stormwater Infrastructure Repairs and Rehabilitation Contract
Term Contract
Results
Less than $1,195,675 est. value
Wilmington, NC 28402

Water/Sewer Service Installation
New Construction - 4,111 SF
Construction
Spring Lake, NC

810 Desoto Avenue Storm Drainage Improvements
Post-Bid
Kannapolis, NC 28083

Storm Water Repair and Improvement FY2021-C
Results
Less than $4,289,180 est. value
Charlotte, NC 28202

Starvalley 7141 Storm Drainage Improvement Project
Post-Bid
$1,899,563 est. value
Charlotte, NC

Riverwalk Storm Drain
Results
Less than $361,443 est. value
Jacksonville, NC 28541

Repair Drainage BLDG. 4859 CDC Playground 2 & 3
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC

Mcmullen Creek Basin Rehabilitation
Results
$9,000,000 est. value
Charlotte, NC

FY 21 Storm Water Maintenance Contract
Post-Bid
Indian Trail, NC

Fy21 Water And Sewer Repairs
Results
Charlotte, NC

Richard East Whitted Complex Stormwater Improvements
Post-Bid
Hillsborough, NC 27278

Starvalley Drive 7141 Storm Drainage Improvement Project
Results
Less than $1,899,563 est. value
Charlotte, NC 28210

Reported 06/27/2022 10:20 AM
Project Title

Highway 182 Waterline Loop to Crouse - Lincoln County

Physical Address View project details and contacts
City, State (County) Lincolnton, NC   (Lincoln County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Lincolnton, North Carolina. Conceptual plans call for site work for a water / sewer project. Highway 182 Waterline Loop to Crouse A detailed scope has not yet been determined As of June 24, 2022, this project is currently in the FY 2023-2027 CIP. Funding for this project is allotted in the couny's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents