Similar Projects
New Waikoloa Public Library
New Construction
Conception
Waikoloa Village, HI

Kohanaiki Coastal Park Improvements - Hawaii County
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Kailua Kona, HI 96740

DPW- Puna Emergency Access Road Improvements( Hawaiian Acres) - Hawaii County
Infrastructure
Design
$1,100,000 CJ est. value
Hilo, HI 96720

DPW- Puna Emergency Access Road Improvements( Hawaiian Acres) - Hawaii County
Infrastructure
Design
$1,100,000 CJ est. value
Hilo, HI 96720

La'i 'Opua Village 4 Subdivision Phase 2 (HEMA)
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Kailua Kona, HI 96740

Pauahi Street Bridge Rehabilitation
Infrastructure
Bidding
$250,000 CJ est. value
Hilo, HI 96720

Nanakuli Homestead Cemetery Site Restoration & Repairs
Infrastructure, Alteration
Post-Bid
Nanakuli, HI 96792

Ground Leveling 8000 Sf - Hilo, HI
Term Contract
Post-Bid
Hilo, HI

Lower Hamakua Ditch - Flume 8, 25, 37, 38, and 49 Improvements
Alteration
Results
$2,750,000 est. value
Hilo, HI

South Hilo Roadway and Drainage Repairs
Infrastructure
Results
$90,000 est. value
Hilo, HI

Kumu Hou at Waikoloa
New Construction, Infrastructure
Pending Verification
$449,000,000 CJ est. value
Waimea, HI 96743

Kumu Hou at Waikoloa
New Construction, Infrastructure
Pending Verification
$449,000,000 CJ est. value
Waimea, HI 96743

Honokaa Fire Station Replacement - Hawaii County
Demolition, New Construction, Infrastructure
Conception
$15,200,000 CJ est. value
Honokaa, HI 96727

Hakalau Bridge Rehabilitation - Hawaii Department of Transportation
Infrastructure
Design
$65,000,000 CJ est. value
Hakalau, HI 96710

Pavement Repairs at Various Locations
Infrastructure
Bidding
$1,000,000 CJ est. value
Waimea, HI 96743

Last Updated 04/07/2023 12:08 PM
Project Title

Haaheo Elementary School - Multi-Purpose Building

Physical Address View project details and contacts
City, State (County) Hilo, HI 96720   (Hawaii County)
Category(s) Commercial, Education, Government/Public, Heavy and Highway, Laboratory
Sub-Category(s) Elementary School, Laboratory, Library - Public, Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $20,440,400 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 30, 2022, the project has not been awarded. A timeline for award has not been confirmed. The work generally consists of a new multi-purpose building, a new library and computer lab building, a new four classroom building, new covered walkways, extension of existing parking lot, renovation of six existing classrooms, and offices spaces, demolition of three existing structures and covered walkways. The estimated construction cost of this project is greater than $10 million. Contract Duration: 974 Calendar Days Contractor License Requirement: A or B Start of Service Date: 05/31/2023 End of Service Date: 09/01/2025 Vendors having questions regarding the project must submit them in writing to the Project Coordinator. Questions must be received no later than 14 calendar days prior to the bid closing date. Addenda and/or bid clarifications (if required) will be issued no later than 7 calendar days prior to the bid closing date

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment, Laboratory Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Laboratory Furniture, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents