Similar Projects
Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

Z--Dino - Design/Build, Replace Water Line
Results
$500,000 to $1,000,000 est. value
Jensen, UT 84035

Cedar City Air Tanker Base Water Pipe Repair
Results
Less than $25,000 est. value
Cedar City, UT

400 East 540 North to Center Street Culinary Waterline
Post-Bid
$250,000 est. value
Centerville, UT

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

Excavation and Water System Repair Services
Term Contract
Post-Bid
Park City, UT 84060

2019 Public Works Project
Results
Hyrum, UT 84319

2020 Water Line Projects - 100 E, 200 E, and 300 E
Post-Bid
Midway, UT 84049

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

500 South Surplus Siphon Vault Replacement
Results
Less than $244,438 est. value
Salt Lake City, UT 84104

2020 Water Line Projects
Post-Bid
Midway, UT 84049

Reported 05/27/2021 12:00 AM
Project Title

CDBG Water Meter Project 2021

Physical Address View project details and contacts
City, State (County) Wellington, UT   (Carbon County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The removal and replacement of 10 master meters in six different meter vaults. Currently all 10 meters are manual read meters. This project will replace these meters with modern master meters with data outputs that will electronically transmit the readings to Wellington's existing meter reading system. The scope of improvements will include removing existing meters, modifying existing piping to accommodate new meters, and commissioning the new meters for use with Wellington's current meter reading system.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents