Last Updated | 10/22/2021 01:38 PM |
Project Title | Construction Engineering Inspection Services for Water and Wastewater Projects |
Physical Address | View project details and contacts |
City, State (County) | FL (Saint Lucie County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide CEI Services for the following projects: The firm(s) must perform as the St. Lucie County Utilities District’s representatives for the following projects: 1. Approximately 25,000 lineal feet of 6” force main from the Fairgrounds wastewater treatment plant along Okeechobee Road and tie into existing force main. Approximately 25,000 lineal feet of 12” water main along Okeechobee Road in order to loop the Midway Road and Okeechobee Road corridors water mains. 2. Approximately 9,000 lineal feet of 6” force main along Midway Road from a point approximately 5,700 lineal feet west of I95 to a point approximately 3,300 lineal feet east of I95 then north approximately 8,000 through existing easement and connect to existing dryline force main and approximately 300 lineal feet on Gordy Road to connect the existing dryline force main to the existing active force main on Okeechobee Road. 3. Approximately 3,250 lineal feet of 8” water main on US1 between the Turnpike Feeder Road and the St. Lucie/Indian River County line. Approximately 8,200 lineal feet of 12” water main on Indrio Road between Emerson Avenue and Taylor Dairy Road 4. Water and wastewater trunk lines, associated repump stations and disinfectant stations from the North County area to the South County area, approximately 20 miles, remaining in the St. Lucie County Utilities service area wherever possible to maximize potential customer connections. 5. Approximately 17,000 lineal feet of water distribution system in the Queens Cove subdivision to replace existing water distribution system. Approximately 13,500 lineal feet of water distribution system in the Fort Pierce Shores subdivision to replace existing water distribution system. 6. Deep injection well at the Taylor Dairy Water and Wastewater Treatment site. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |